| Other MM Interview Questions |
| |
| Question | Asked @ | Answers |
| |
| What is meant by MRP Type and lot sizing? | | 1 |
| Can anyone plz tell me what is a procedure( in detail step
by step ) to migrate from tax procedure TAXINJ to TAXINN ? | | 1 |
| Can anyone explain third party rocurement process? | HCL | 2 |
| Dear Sir
I have one query regarding subcontracting
Our firm provides blank paper to one vendor for printing
work and takes it back after printing. The vendor is not
sending the printed paper in a single slot, he send it in
part by part.
For example we send the blank paper 1000Kg for printing
paper. Subcontracting vendor send it back after printing in
the slot of 400 kg, 300kg and 250kg…..he tells us that
remaining 50kg is wasted during printing and cutting
process. We are not taking back the scarp material…we come
to know finally about the qty wastage after the last qty
receive and respective invoice made.
So pls guide me to map this scenario in SAP.
In our firm both the printed paper and blank paper lies in
Raw material and raw material is non- valuated in our firm.
I also tried it from my side.
I created one Bom (cs01)
Then I create the subcontracting Po putting the material
and component provide. With cost centre and g/l account.
(me21n)
Then I provide the component to vendor (MB1B with mvt type –
541)
Then I do the GRN for 400 and 300 and respective Invoice
verification
But at the time of final invoice and GRN we came to know
that the qty is reduced.
If we do GRN for 250kg, then the PO is still open for
50kg..And we are not taking back this 50Kg as it’s wasted
during printing and cutting operations.
Pls guide me map this scenario.
| | 3 |
| What are release groups and release codes? | | 4 |
| What are valuation area, valuation category and valuation class? | James-QTC | 7 |
| What is the difference between LSMW and CATT? | | 2 |
| What are the tools available for data migration in SAP? | | 4 |
| WHAT R ALL THE LEVELS INFORECORDS R MAINTAINING ? | | 5 |
| Can anyone explain pipeline process? | | 2 |
| What is the difference between the stock transfer between,
two plants belonging to same company code and those
belonging to different company code? | | 2 |
| at what level accounting view is maintained ?
the moment u enter data in accounting view what prompt
request u will get?
| Artech | 2 |
| How is scrap accounted in subcontracting? | | 2 |
| How can I transfer the goods as consignment from plant to
another plant ? Which configurations or set up should I
maintain ? | | 5 |
| What are the settings required for quota arrangement? | | 1 |
| How are the byproducts taken care of in subcontracting? | | 2 |
| What are the types of special stocks available? | Patni | 3 |
| How is an item with serial no. managed? | | 4 |
| What is the difference between a contract and a scheduling
agreement? | | 2 |
| What is RTP? | | 3 |
| |
| For more MM Interview Questions Click Here |