ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Electrical Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3079)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3290)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13338)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2363)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (416)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (163)
 Instrumentation interview questions  Instrumentation Interview Questions (2382)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (106)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (44)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (78)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1196)
Question
why double earthing is required for welding machine & 
electrical tools.
 Question Submitted By :: Electrical-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
to give low resistance and if one earth is out of
order,second will do the required work of earthing the equipment
 
Is This Answer Correct ?    39 Yes 2 No
Divyesh
 
Answer
# 2
for safty purpose only. if one is failure another in line 
Is This Answer Correct ?    17 Yes 3 No
Dinakaran
 
 
 
Answer
# 3
Double earthing is
used to give
minimum
resistance to the
flow of whole
current of the
apparatus in case
of short circuit or
leakage or any
such other fault.
 
Is This Answer Correct ?    15 Yes 1 No
Bilal Mir
 
Answer
# 4
1.For safety of personnel & equipment
2.Reduces voltage fluctuation in case of excess current flow.
3.In case non use of tripping devices it reduces the risk of electrocution.
 
Is This Answer Correct ?    9 Yes 4 No
Pravin
 

 
 
 
Other Electrical Engineering Interview Questions
 
  Question Asked @ Answers
 
will the turbogenerator operate on leading power factor with out modification in the stator winding. Toyota 3
What is the fuction of UV & how it works in circut breakers? is it one type of relay?   4
What is CRT (Contact Resistance Test) for Isolators or Dis- connector Switches? Why we performed it & whats the Testing procedure. Siemens 1
What is the function of a turbo charger in a 1000kva DG set   5
Why does the power consumed is always constant even if a fan speed is altered?   5
Your B.tech marks is being given in CGPA grade. How is it calculated?   1
how many types of grounding?   7
what is difference between earhing and neutral   2
what is meant by peak load   2
battery spicgravity mesuserd?   1
how electrical energy is converted into mechanical energy in dc motor   3
why so voltage is same in parallel circuits and current is same in series ckt?   3
 
For more Electrical Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com