ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Electrical Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3077)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3290)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13335)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2363)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (416)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (79)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (163)
 Instrumentation interview questions  Instrumentation Interview Questions (2381)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (106)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (44)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (77)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1196)
Question
explain in detail  HV & LV  bushing connection in power 
transformer  (110 / 11 kv 16 MVA)
 Question Submitted By :: Electrical-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
THE HV BUSHING i.e 110KV SHOULD HAVE THE CAPACITY TO WITH
STAND THE RATED KV i.e 110KV,AND IF IT IS HAVING THE WITH
STAND CAPACITY MORE THEN THE RATED KV THEN IT CAN BE
CONNECTED TO HV OF THE POWER T/F.IN SAME WAY THE LV BUSHING
SHOULD HAVE THE CAPACITY TO WITH STAND THE LV RATED VOLTAGE
i.e 11KV,THEN ONLY IT CAN BE CONNECTED TO THE LV OF THE
POWER T/F i.e OF 16MVA.
 
Is This Answer Correct ?    10 Yes 3 No
Sudhirkumar Singh
 
Answer
# 2
you question was not understand 
Is This Answer Correct ?    10 Yes 5 No
Muralichppl
 
 
 
Answer
# 3
here in 111/11 kv 16 MVA)transformer the hv side is 110kv
side i.e primary one whereas secondary side is 11kv is lv
side.
 
Is This Answer Correct ?    6 Yes 1 No
Satish
 
Answer
# 4
Bushing connections at HV side is 3 and LV side is 4 with
highly insulated.Normally at substations 110/33 transformer
will be used and then same 33kv will be step down to 11kv
to avoid losses.
 
Is This Answer Correct ?    3 Yes 3 No
Talluri
 
Answer
# 5
HV side bushing connection is only 3 terminals R,Y, B. In
LV side 4 terminals are there R, Y, B, N. Neutral is
grounded in station transformers. But in distribution
transformers the neutral is not grounded in secondary and
is extended to commercial use.
 
Is This Answer Correct ?    0 Yes 0 No
Satheesh K
 
Answer
# 6
here in 111/11 kv 16 MVA)transformer the hv side is 110kv
side i.e primary one whereas secondary side is 11kv is lv side.
 
Is This Answer Correct ?    8 Yes 12 No
Shyamkr
 

 
 
 
Other Electrical Engineering Interview Questions
 
  Question Asked @ Answers
 
Brief function of stepper motor   1
Explain how Hormonics will effect the Electrical System?   5
What is the diffrece between CAPACITOR BANK & CAPACITOR OF MOTOR?   4
kva/kvr   2
HAI,I HAVE 6,60KW MOTOR FEEDERS IN MY MCC PANEL.HOW CAN I DO MY SETTINGS FOR OVERLOAD,SHORTCIRCUIT,GROUNGFAULT,INSTANTANEOUS TRIP FUNCTION IN MY 4000A CIRCUIT BREAKER?   1
SUPPOSE A CIRCUIT BREAKER HAS TRIPPED THE THE LINE WHEN A FAULT OCCUR ON IT.NOW WHEN THE FAULT HAS BEEN CLEARED, HOW THE CIRCUIT BREAKER WILL CLOSE AUTOMATICALLY NOT MANUALLY. Bureau-of-Energy-Efficiency 5
in a transmission line if the load is suddenly increased in the receiving end of the system the phase shift will ?   1
why ct is connected at bushing of transformer ??????????   3
I am having 120KVA UPS,which is connected to DG & normal power. What is the power drawn by this system when system is running on DG ????   2
can transformer develop three phase poer from a single phase source?   2
why the inserting resistance in wound rotor induction motor decrease the starting current and increase the starting torque   2
Why is the uniform distribution of the capacitor discs in a suspension type insulators essential , what can u do to improve the string efficiency ?   1
 
For more Electrical Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com