Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3072)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3287)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13323)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2362)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (416)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (79)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (163)
 Instrumentation interview questions  Instrumentation Interview Questions (2375)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (106)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (43)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (75)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1195)
Question
What is meant by Anchorage length? Development Length?
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
Development Length : Is a length of bar or
reinforcement rod is required to transfer the load to
another bar safely and not affecting to the member which is
in it. 49 times of bar is compression and 46 times is in
tension. But in construction 50 times takes of bar diameter.
Anchorage Length : Required distance to transfer
load and which is depends up on member competence i.e. type
of materials used and bearing strength and type of grout
which is in it.
 
Is This Answer Correct ?    37 Yes 10 No
V.purushotham
 
Answer
# 2
Development length is the length overlap of bars tied to
extend the reinforcement length. is about 50 times the dia
of bar is consider to safe.

Anchorage length- this is the additional length of bar
recquired ti insert in another at the junction. For example-
Main bar of the beam in column at beam column junction.
this length is simiilar to the lap length.
 
Is This Answer Correct ?    60 Yes 35 No
Sjtbehera
 
 
 
Answer
# 3
Basically the development length is the length which should
be such that the stress should develop on both sides of the
point of maximum stress in the steel bar. If this point is
in the mid span of the beam then it can develop on both
sides but if the maximum stress is at the end (like in
cantilever) then we need to provide extra length beyond the
end support center line. If this extra anchoring length is
straight which is not beyond the nominal cover of the end
support then its same as development length and if this
extra anchoring is beyond the nominal cover of the end
support, then it is not straight bar i.e. with hooks then it
is called as anchorage length which is used to provide full
development length & an additional length for stability of
the structure.Therefore it is the anchorage length must
provide to detail any structure which have the same
situation as described in the above rather than development
length.
 
Is This Answer Correct ?    5 Yes 1 No
Alehegn Yehuala
 
Answer
# 4
This is the additional length of steel of one structure required to be inserted in other at the junction. For example, main bars of beam in column at beam column junction, column bars in footing etc. 
Is This Answer Correct ?    4 Yes 2 No
Manish
 
Answer
# 5
anchorage lenght is the lenght of overlap of the bars into
each other the lenth is 45times into dia of bar
 
Is This Answer Correct ?    7 Yes 33 No
Trevis
 
Answer
# 6
What is meant by Anchorage length? Development Length?
Ans: Both are same.
 
Is This Answer Correct ?    10 Yes 42 No
S P Sharma
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
what is M & 20 of M20 concrete Bharti 9
how many cement bag in 1m*m*m   33
what is rigid pavement   3
how the load will be transfer from pile foundation to soil? CCCL 1
state the difference between direct and indirect cold water supply scheme   1
what"s the difference between fe 415 grade steel and fe 500 grade steel? and which one is mostly used for residential and apartment constructions? L&T 5
WHAT IS NON DESTRUCTIVE TEST?PLEASE GIVE ME THE PROCEDURE?   3
How many materials e.g bricks, cement, sand, stone required to build a house for 100 sqft   3
IN CIVIL ENGINEERING DESIGN WHY WE ARE USING LIMIT STATE METHOD IS BEST? I THINK WORKING STRESS METHOD IS BEST? EX; FOR COLOUMN DESIGN IN LIMIT STATE METHOD AST IS;1913SQ.MM SAME TIME WORKING STRESS METHOD IS ;2213. SO I THINK WORKING STRESS METHOD IS VERY STRONG COMPARE THEN LIMIT STATE METHOD? MY OPENING IS CORRECT OR NOT? PLS TO EXPLAIN SIRS   12
What should be the size (Cubic meter) of a water tank for 1000 Ltrs. capacity?   7
point of contraflaxure   1
how do understand the plinth beam croos section diagram   1
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   