ALLInterview.com :: Home Page KalAajKal.com
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
tip       Ask Questions on ANYTHING, that arise in your Daily Life at     FORUM9.COM
Google
 
Categories  >>  Software  >>  Testing  >>  Manual Testing
 
 


 

 
 Automation Testing interview questions  Automation Testing Interview Questions
 Manual Testing interview questions  Manual Testing Interview Questions
 QA Concepts interview questions  QA Concepts Interview Questions
 Mobile Testing interview questions  Mobile Testing Interview Questions
 Test Cases interview questions  Test Cases Interview Questions
 Test Documents Reporting interview questions  Test Documents Reporting Interview Questions
 Testing AllOther interview questions  Testing AllOther Interview Questions
Question
what are the initial templates used in a project
(glamorous...)
 Question Submitted By :: Guest
I also faced this Question!!     Rank Answer Posted By  
 
  Re: what are the initial templates used in a project (glamorous...)
Answer
# 1
(ESWAR KALYAN)

An SRS is basically an organization's understanding 
of a customer or potential client's system
requirements …

The SRS also functions as a
blueprint for completing a project with as little cost 
growth
as possible. 

The SRS is often referred to as the "parent"
document because all subsequent project management 
documents,
such as design specifications, statements of work, software
architecture specifications, testing and validation plans, 
and
documentation plans, are related to it.

It's important to note that an SRS contains functional and
nonfunctional requirements only…
It serves as an input to the design specification

•	Therefore, the SRS
must contain sufficient detail in the functional system
requirements so that a design solution can be devised. 
•	It serves as a product validation check. The SRS 
also
serves as the parent document for testing and validation
strategies that will be applied to the requirements for
verification. 

1. Scope

   1.1 Identification.

Identify the system and the software to which
this document applies, including, as applicable,
identification number(s), title(s),
abbreviation(s), version number(s), and release
number(s).

  1.2 System overview.
State the purpose of the system or subsystem
to which this document applies.
  
  1.3 Document overview.
Summarize the purpose and contents of this
document.
This document comprises six sections:
•	Scope 
•	Referenced documents 
•	Requirements 
•	Qualification provisions 
•	Requirements traceability 
•	Notes 
Describe any security or privacy considerations
associated with its use.

2. Referenced Documents
   2.1 Project documents.
Identify the project management system
documents here.
   2.2 Other documents.
   2.3 Precedence.
   2.4 Source of documents.

 3. Requirements
	This section shall be divided into paragraphs to
specify the Computer Software Configuration Item (CSCI) 
requirements, that is, those characteristics
of the CSCI that are conditions for its acceptance.
CSCI requirements are software requirements
generated to satisfy the system requirements
allocated to this CSCI. Each requirement shall be
assigned a project-unique identifier to support
testing and traceability and shall be stated in
such a way that an objective test can be defined
for it.
  3.1 Required states and modes.
  3.2 CSCI capability requirements.
  3.3 CSCI external interface requirements.
  3.4 CSCI internal interface requirements.
  3.5 CSCI internal data requirements.
  3.6 Adaptation requirements.
  3.7 Safety requirements.
  3.8 Security and privacy requirements.
  3.9 CSCI environment requirements.
  3.10 Computer resource requirements.
  3.11 Software quality factors.
  3.12 Design and implementation constraints.
  3.13 Personnel requirements.
  3.14 Training-related requirements.
  3.15 Logistics-related requirements.
  3.16 Other requirements.
  3.17 Packaging requirements.
  3.18 Precedence and criticality
requirements.

4. Qualification Provisions:To be determined.

5. Requirements Traceability:To be determined.

6. Notes:
	This section contains information of a general
or explanatory nature that may be helpful, but is
not mandatory.
  6.1 Intended use. 
This Software Requirements specification shall
...
  6.2 Definitions used in this document. 
Insert here an alphabetic list of definitions
and their source if different from the declared
sources specified in the "Documentation
standard."
  6.3 Abbreviations used in this
document. 
Insert here an alphabetic list of the
abbreviations and acronyms if not identified in the 
declared sources specified in the "Documentation
Standard."
  6.4 Changes from previous issue. 
Will be "not applicable" for the initial
issue.

Revisions shall identify the method used to
identify changes from the previous issue.
 
Is This Answer Correct ?    0 Yes 0 No
Eswar Kalyan
 

 
 
 
Other Manual Testing Interview Questions
 
  Question Asked @ Answers
 
Which testing is used only in web based application but not for client-server applications? Cap-Gemini3
what are the mandatory fields when you rise a bug QA4
whatis the diffrence bug ,error,defect Manhattan11
how do you ensure by testing that the transactional refuilement or an application are met  1
how many members are involved in test plan? and tell me names? Wipro2
Hello can any one help we which certification is can be taken is it ISTQB or CSTE ? How to prepare for the exam & where we can find the materials etc for the prepartion? Please Help me. Thanks in advance  3
if u have 10 inputs & you written 500 testcases for that.out of this u found 20 defects.as a tester how u found from which requirement that a particular defect will occur. Semantic-Space4
what is the diff between function and Sub function  3
iam new to testing ,i want improve knowledge on manual and how to improve theoretically r practical?any one give me suggestion?  1
How is your project connected to the Database...tell the procedure?? SuperValu1
What is red box testing and yellow box testing? T-systems4
how to deploye the build when the developers give the source code..?  1
hi what is difference between sdlc and stlc. iSoft5
what is thread Testing  2
what is Software Development Life Cycle (SDLC)?  1
If the developer rejects that its not a bug means then whats the next step we follow? Logica-CMG8
What is mean by testing Methodology? BlueShift-Technology6
what is the Difference between Integration testing and system testing?  8
What is defect life cyce?  2
what is reqirements testing and risk based testing? Logica-CMG2
 
For more Manual Testing Interview Questions Click Here 
 
 
 
 
 
   
Copyright Policy  |  Terms of Service  |  Help  |  Site Map 1  |  Articles  |  Site Map  |   Site Map  |  Contact Us interview questions urls   External Links 
   
Copyright © 2007  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  Forum9.com   ::  KalAajKal.com