ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3114)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3298)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13420)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2382)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (420)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (165)
 Instrumentation interview questions  Instrumentation Interview Questions (2393)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (107)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (45)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (78)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1202)
Question
mix design of concrete using indian standard methods
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
M7.5,M10,M15,M20,M25,M20,M40,M50,M60

depending upon structure & mix design shoild be vary
 
Is This Answer Correct ?    137 Yes 22 No
Jayakumar
 
Answer
# 2
see IS 10262 for mix design of concrete 
Is This Answer Correct ?    71 Yes 15 No
Jeganathan
 
 
 
Answer
# 3
M10, M15, M20, M25, M30, M35, M40 are the mix design of
concrete.
 
Is This Answer Correct ?    34 Yes 4 No
Sangram Keshari Rout
 
Answer
# 4
Use Sp 23 for mix design of concrete 
Is This Answer Correct ?    28 Yes 12 No
Sharath
 
Answer
# 5
ACCORDING TO IS CODE M15,M20,M254,M30,35 etc CAN BE USED&
ALSO DEPEND ON WHERE YOU ARE USING THAT CONCRET
 
Is This Answer Correct ?    10 Yes 4 No
Vishal Kakade
 
Answer
# 6
yes 
Is This Answer Correct ?    7 Yes 1 No
Nrudingha Pradhan
 
Answer
# 7
M10,M15,M20,M25,M30,M35,M40,M50,M60,M70& M80 These are
the mix designs now using in civil engineering field as per
the indian standard methods.
 
Is This Answer Correct ?    7 Yes 2 No
Sekar.k
 
Answer
# 8
i do concrete mix disign up to field work. 
Is This Answer Correct ?    10 Yes 6 No
Rajubhai
 
Answer
# 9
it should be safe if we consider our code for the building
constructing in India..the norms are designed based on our
economic & environment conditions in is code books.
 
Is This Answer Correct ?    2 Yes 0 No
Alihyderkhan
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
How to calculate the quantity of water in cement mortar eg. CM 1:3?   1
what is the slump of pile concreting work? give me the value of minimum and maximum value of slump and how give slump in pile?   3
why shear reinforcement is not provided in the design of footing?   2
What is design life of a bridge?   3
WHEN BRICK SIZE IS 3X5X9" , WHAT WOULD BE THE NUMBER OF BRICK REQUIREMENT FOR 100 SQFT AREA OF 5" width?   4
What are the grade of steel used in the steel design.? Engineers-India-Limited 14
WHAT IS PMB IN CASE OF ROAD PAVEMENT? WHY PMB IS PREFERED THAN ORDINARY BITUMINIOUS SURFACING?   1
How foundation is designed, Column design and beam design L&T 3
which tie is used in binding of steel double tie or single ti?   1
a revised estimate is prepared when the original estimate has exceed by more than 1 percent 2 10 18.40   2
What are the causes of failure of foundations and remedial measures?   6
how to calculate the steel quantity for columns and beams   6
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com