Tracing a Defect is nothing but Deviation of the Customer
requirement in the application.
If Customer Requirement is not performing its function or
not available in application, i.e. called Defect.
Defect Tracking means... Ensure that the Defect is related
to which Test Case. You should able to find which defect is
related to which Requirement, Tracking the defect with
respect to Test Cases... you can maintain the documents
with Hyperlinks to desired Documents
for e.g. Functional Requirement Specifications Document
Use Case document
Master Test Case Document
Detailed Test Case Document
Defect Profile Document
if you maintain according to your desired documents with
hyperlink, you can easily Trace back Which Defect is
related to which Requirement...
Implementing the concerned test cases on the concerned
functionalities ,If it behaves as per the customer
requirement.We can conclude that it has no defect,otherwise
it is a defect
tracking the defect means trace the defect to it's complete
life cycle . I mean to say if tester find the defect (
deviation from requirement ) he/she will assign it to
developer with priority & severity . Developer fixed it in
these procedure defect has lot of status like new , open ,
reopen , fixed, differed , rejected , verified ,closed .TO
keep the track of defect from new to closed is called
defect trace
Tracing a defect means...
what is the status of the defect in its life cycle and, for
which requirement and which test case it is reported as
defect!
we can trace a defect using a defect traking tool,r by
using a excel sheet.
As soon as u find a defect.you will track that defect Using
a Bug Tracker tool and give the Status as New.If the
Developer Fixes he gives the status as Fixed.After Fixing
the tester will retest and give the status as Closed(If he
feels defect is fixed).the Entire Process will be carried
out in a Bug Tracking Tool(depends on the Company which
tool tey are using).
Through Traceability matrix we can trace which part of the
software(requirement) is failed(defect).
Traceability Matrix:
Traceability matrix is a document defines mapping between
customer requirements and prepared test cases.
how The engineer communicates wiht T.L as well as test
manager, In wich situation this type of i mean serious
commnication takes place(give me one real time example).and
how the interaction will takes place between tester and
client can anybody plz clatify me.
Suppose that your're running tests on the windows calculator
and find that 1+1=2,2+2=5,3+3=6,4+4=9,5+5=10 and 6+6=13.
Write a bug title and Bug Description that effectively
describes this problem?
In a system designed to work out the tax to be paid:
An employee has £4000 of salary tax free. The next £1500 is
taxed at 10%
The next £28000 is taxed at 22%
Any further amount is taxed at 40%
To the nearest whole pound, which of these is a valid
Boundary Value Analysis test case?
The options provided are
a)£1500
b)£32001
c)£33501
d)£28000
hi frnds!
can any one help me by answering the below questions.
1.what is client server testing ?
2.what is web-based testing and what exactly tested in this ?
3.and exact difference between these two type of testing methods
i can be reached on shrinivaster@gmail.com if any help
needed from my side.
thanks
shri
I am doing manual testing for on web application.how to
prepare the tracebility matrix for that website? whats the
use of the tracebility matrix?. canu send one model of the
tracebility matrix.
The company has software running in its production
environment that was designed and tested on its quad-
processor servers with 16 GB of RAM. In order to meet
budget constraints, its disaster recovery plan calls for
this same software to be installed on functionally
identical servers, which are dual-processor with 12 GB of
RAM. The test group has been tasked with confirming that
the software is going to work on the hardware proposed in
the disaster recovery plan.
-what testing types is being used in the scenario above?
As a tester I found a show stopper(critical defect) this
evening whereas the project is going to be delivered to the
client tomorrow morning so there is no time left.I reported
the same to my test manager but he is not ready to
convinced with me moreover he wants to close the matter as
it is....in this senario wat will u do???