Answer / raghuram

your questuion is how to decide the load
combinations................load combinations mainly
depends on the site. in general dl+ll is common for all
types of structures.eartquake loads are considered the site
is in earthquake zone.if the site on high altitudes where
the wind pressure acts wind loads are to be added.in all
tha cases dl+ll is common and the rest depends on the site
conditions...................

Is This Answer Correct ?    54 Yes 4 No

How we decide the the load combinations for design of RCC structures?..

Answer / amit k acharya

Combination of live load,dead load,wind load & earthquick
force.

Is This Answer Correct ?    40 Yes 18 No

How we decide the the load combinations for design of RCC structures?..

Answer / lakshmanan.k

D.L , L.L, SEISMIC L, and mainly considered for HORIZONTAL
REACTION force is available in frame joints& column ,beam
joints. which is the most critical value is taken.

Is This Answer Correct ?    23 Yes 12 No

How we decide the the load combinations for design of RCC structures?..

Answer / abubakar

its mainly depends on the site. dl+ll is commonly for all
the site. if the site is situsted in earth quake zone then
the earth quake load is to be taken, if the site is in the
high altitude then we have to be taken wind load. the main
thing is wherever the earth quake load is taken then there
wind load cant take. or vice versa

Is This Answer Correct ?    12 Yes 3 No

How we decide the the load combinations for design of RCC structures?..

Answer / shailendra singh sikarwar

its mainly depends on the site. dl+ll is commonly for all
the site. if the site is situsted in earth quake zone then
the earth quake load is to be taken, if the site is in the
high altitude then we have to be taken wind load. Load also
depend on the soil bearing capacity. Partial safty factor
is to be taken.

Is This Answer Correct ?    6 Yes 3 No

How we decide the the load combinations for design of RCC structures?..

Answer / vkg

selection of load case for design of structures is depends
on designer. generally select those load case which give max
Mz My & Py (**but it differ structures to structures). But
some time we select those L/C, whose probability of
occurring is more.for example, in mountainous area we select
those combination which contain snow load along with other
primary loads.

Is This Answer Correct ?    4 Yes 1 No

How we decide the the load combinations for design of RCC structures?..

Answer / mallikarjun

commonally dead load &live load combination for common
site .If site is situated in earth quake zone & at high
altitude , combination of all above loads is necessary.
that is DL+LL+EL+WL

Is This Answer Correct ?    10 Yes 17 No

Post New Answer

More Civil Engineering Interview Questions

what is the water-cement ratio of mix design while 30mpa in 7 days?

0 Answers   Google,


WHAT IS PMB IN CASE OF ROAD PAVEMENT? WHY PMB IS PREFERED THAN ORDINARY BITUMINIOUS SURFACING?

1 Answers  


though u r a civil engineer, y r u interested in tcs???

0 Answers   TCS, URC Construction,


What is the result of cube in 7 days test ?

3 Answers   Casa Grande, Heer Enterprises, Him Shikhar Construction,


What is the exact meaning for under & over reinforced beams & when they have to used..

11 Answers   Gammon, L&T, MEIL,






What is GSB gradation

0 Answers  


which grade of cement is more suitable for construction..? and why.?? what is difference between 33, 43 and 53 grade cement..?

1 Answers   L&T,


wat is six sigma course ? is it good for civil engineers . wat is pmp certification ? is it good for civil engineers .

1 Answers   CCCL,


What is OSHA compliance?

0 Answers  


what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?

0 Answers  


I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.

0 Answers  


sir, whitch is the best book (writer name) for prepration of gate....

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5084)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16631)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1094)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)