ALLInterview.com :: Home Page KalAajKal.com
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
tip   SiteMap shows list of All Categories in this site.
Google
 
Categories  >>  Software  >>  Testing  >>  Manual Testing
 
 


 

 
 Automation Testing interview questions  Automation Testing Interview Questions
 Manual Testing interview questions  Manual Testing Interview Questions
 QA Concepts interview questions  QA Concepts Interview Questions
 Mobile Testing interview questions  Mobile Testing Interview Questions
 Test Cases interview questions  Test Cases Interview Questions
 Test Documents Reporting interview questions  Test Documents Reporting Interview Questions
 Testing AllOther interview questions  Testing AllOther Interview Questions
Question
If U have Test Cases already prepared and u have to just 
excute those test cases in a very short time  then how will 
U decide which test cases has to be excuted first. Is there 
any technique ?
 Question Submitted By :: Guest
I also faced this Question!!     Rank Answer Posted By  
 
  Re: If U have Test Cases already prepared and u have to just excute those test cases in a very short time then how will U decide which test cases has to be excuted first. Is there any technique ?
Answer
# 1
I think there is no technique avalable.
But using risk analysis i will decide which part of the 
application is more important and critical. Now i will 
execute those test cases which are related to that part 
from the set of available test cases.

please correct me.
rsntallapudi123@yahoo.com
 
Is This Answer Correct ?    0 Yes 0 No
Rsntallapudi123
 
  Re: If U have Test Cases already prepared and u have to just excute those test cases in a very short time then how will U decide which test cases has to be excuted first. Is there any technique ?
Answer
# 2
Yes...U will test those TC's who r critical and has high or 
very high priority.
 
Is This Answer Correct ?    1 Yes 0 No
Sriharsha
 
 
 
  Re: If U have Test Cases already prepared and u have to just excute those test cases in a very short time then how will U decide which test cases has to be excuted first. Is there any technique ?
Answer
# 3
While test cases preparation time only we'll decide the 
priority based on the functionality. so that if there is no 
time to exeute all the test cases, that time we can execute 
high level priority test cases first, and then medium 
priority test cases and then if time permits we'll execute 
low level priority test cases. 

if i'm wrong plz correct me:)
 
Is This Answer Correct ?    0 Yes 0 No
Jyotsna
 
  Re: If U have Test Cases already prepared and u have to just excute those test cases in a very short time then how will U decide which test cases has to be excuted first. Is there any technique ?
Answer
# 4
I dont think so we are assigning Priority to Test Cases. In 
this suituation all we got to do is sitting extra hour and 
finishing execution of all TC's.
 
Is This Answer Correct ?    0 Yes 1 No
Mavan
 
  Re: If U have Test Cases already prepared and u have to just excute those test cases in a very short time then how will U decide which test cases has to be excuted first. Is there any technique ?
Answer
# 5
Its better to test the complete high level functionality
(End to End testing) with the test cases in minimum time
 
Is This Answer Correct ?    0 Yes 0 No
Radhika
 
  Re: If U have Test Cases already prepared and u have to just excute those test cases in a very short time then how will U decide which test cases has to be excuted first. Is there any technique ?
Answer
# 6
Apart from priority.
One more thing is to be considered, that is "Test cases
depend on each other".So there might be two test cases say A
& B.
If i conduct A successfully , i need not go for B. B is
dependent on result of A. So this order must be made clear
in mind beforehand.

tell me if i am wrong.
thanks
 
Is This Answer Correct ?    0 Yes 0 No
Manish
 
  Re: If U have Test Cases already prepared and u have to just excute those test cases in a very short time then how will U decide which test cases has to be excuted first. Is there any technique ?
Answer
# 7
By using "PAIR WISE TESTNG".
 
Is This Answer Correct ?    0 Yes 0 No
Geeta
 

 
 
 
Other Manual Testing Interview Questions
 
  Question Asked @ Answers
 
What are cookies and how to test cookies Teradata2
Suppose u have a ICICI Home Page & there is a option link "Bill Payments" so once u click this link then new child window will be open where u have a 1. "amount(Text box)" 2.Auto Debit monthly (check box) & 3. "OK" & "Cancel" Button. Please write the test cases for this Integration Test cases also.  3
There is a front end application to enter name and marital status. you are provided with a fesh database. On entering 5 set of data at a time an error occured, but on entering rest of the records you were not able to reproduce it. What could have been the reason for the error. ACS1
Name three reasons why the tester may choose to record in Analog mode.  3
Inspections, walkthroughs and Reviews comes under QA or QC? GrapeCity8
can anyone write testcases for a wall clock?  5
what is the difference between testing methodology and testing techniques? People-Bank7
What is "Visible State Transition" test? Give example EDS1
Hi, this is sekhar yadav, when the testing starts... Bally-Technologies8
What are the test methodologies?? Accenture9
How you test database and explain the procedure? Verizon1
any body can explain me door lock test cases,cell phone test cases, table and chair test cases  3
Consider if there is no Test lead, No Test Manager and QA Manager. If you are the senior test engineer, you are getting pressure from the client to give the build. But you see that, there r 5 high and 5 low sevierity bugs. So, what you will do and how you interact with the client. Sonata10
How the test plan is a tool and the product? CitiGroup1
How To Resolve the Test cases? Accenture2
how do i know that i have to do white\Black box testing Wipro4
What is the difference between Retesting and Data Driven Testing? CTS8
what is migration testing? Cap-Gemini1
What is the first test in software testing process a)Monkey testing b)Unit Testing c)Static analysis d)None of the above Belly19
Data flow testing is a control structure testing technique where the criteria used to design test cases is that they Option 1 Rely on basis path testing Option 2 Exercise the logical conditions in a program module Option 3 Select test paths based on the locations and uses of variables Option 4 Focus on testing the validity of loop constructs  1
 
For more Manual Testing Interview Questions Click Here 
 
 
 
 
 
   
Copyright Policy  |  Terms of Service  |  Help  |  Site Map 1  |  Articles  |  Site Map  |   Site Map  |  Contact Us interview questions urls   External Links 
   
Copyright © 2007  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  Forum9.com   ::  KalAajKal.com