ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Software >> Testing >> Manual Testing
 
 


 

 
 Automation Testing interview questions  Automation Testing Interview Questions (5206)
 Manual Testing interview questions  Manual Testing Interview Questions (6493)
 QA Concepts interview questions  QA Concepts Interview Questions (656)
 Mobile Testing interview questions  Mobile Testing Interview Questions (115)
 Test Cases interview questions  Test Cases Interview Questions (469)
 Test Documents Reporting interview questions  Test Documents Reporting Interview Questions (58)
 Testing AllOther interview questions  Testing AllOther Interview Questions (609)
Question
Define V -model with diagram
 Question Submitted By :: Manual-Testing
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
BRS Acceptance testing



SRS SystemmTesting



HLD System Integration testing




LLD Component Testing



Coding Unit Testing



Testing
 
Is This Answer Correct ?    40 Yes 11 No
Ashok
 
Answer
# 2
requirement specification acceptance testing
functional analysis system testing
high level design integration testing
detail deign unit testing
code
 
Is This Answer Correct ?    20 Yes 3 No
Plk
 
 
 
Answer
# 3
v-model
v stands for verification and validation
this model defines mapping between s/w development stages
and testing stages
this model derived from FISH model
 
Is This Answer Correct ?    12 Yes 2 No
Anu
 
Answer
# 4
Verification Validation

URS<----------------------->UAT

Process SRS<-------------------->ST Product
Oriented oriented
QA Team HLD<--------------->IT QC Team

LLD<---------->UT

Coding

<------------------Project Management------------->
 
Is This Answer Correct ?    11 Yes 4 No
Dibya Panigrahi
 
Answer
# 5
V- MODEL

Business Case<-------------------------->Release Testing
Requirement<---------------------->Acceptance Testing
System Spec<----------------->System Testing
System Design<---------->Interface Testing
Component Design<-->Component Testing
Construct
Componet
 
Is This Answer Correct ?    12 Yes 6 No
Vijaai7
 
Answer
# 6
UATP
SRS---------------------------- UAT

STP
Analysis--------------System Testing

ITP
HLD----------Integration Testing

UTP
LLD------Unit Testing

Coding
 
Is This Answer Correct ?    9 Yes 3 No
Aditya
 
Answer
# 7
v model means verification and validation model.In this model we have to perform parallel operation for both development and testing

Req_understanding-------------------->User Acceptence Test

Highlevel document ------------------>System Testing

Lowleveldocument------->Integration testing

coding----->unit testing
 
Is This Answer Correct ?    3 Yes 0 No
Sesidhar
 
Answer
# 8
A Short overview of 'v'-model:
* 'v' stands for verification and validation.so we call it as verification and validation model.
* verification means software build is right or not.
* validation means right software build or not.
* validation comprises of BRS,SRS,HLD,LLD.
* After completion of all above process we go for coding.
* verification comprises of unit testing,integration testing,system testing,acceptance testing.
 
Is This Answer Correct ?    2 Yes 1 No
Sathya
 
Answer
# 9
Requirement <-----------------------> Validation
anlysis /
\ /
\ /
System Design <--------------> Integration Testing
\ /
\ /
Software Design <-------> Unit Testing
\ /
\ /
Implementation
(Coding)
 
Is This Answer Correct ?    1 Yes 0 No
Satyendra Singh
 
Answer
# 10
V-Model :-

1) V- model stands Verification & Validation model.
2)In V-model verification done at Left side and verification at right side.
3) verification done at BRS,SRS,Design ,Coding,unit Testing.every process verified and give input to next process.
4) validation done at Integration testing,System Testing,UAT(user acceptance testing).
5)In V -model SDLC & STLC are in relation like with the help of BRS Client perform UAT.
6)With the help of SRS Tester perform testing ,tester reviews the SRS and use system testing.
7)With the help of Designing ,integration testing perform by developer.
8)with the help of coding ,unit testing performed by developer.
 
Is This Answer Correct ?    0 Yes 0 No
Priyanka Tyagi
 

 
 
 
Other Manual Testing Interview Questions
 
  Question Asked @ Answers
 
exact difference between smoke testing, sanity testing and unit testing   7
when there is a new enchancement done by the developers what will do as a tester ?   2
Differences Between Whitebox testing and Blackbox testing CSC 20
How can u justify u r written all the test cases are meeting the client Requirements?if is there any missing functionality how can u know? CSC 3
in this project how many modules? Wipro 1
what is cyclomatic complexity ?   2
hi.i joined in a software testing course recently.but i dnt knw 'c' or 'c++',would it mind? my stream is ece. so i just had a C&DS IN OUR 1ST SEMESTER.   1
Please give me any example of High severity and Low priority type of bug ? TCS 7
How u test 3 Drop Down menu means one is for state,other is for city and Pin code test these drop down   2
What are Test Deliverables?   2
How to prepare traceability matrix?   1
How to test Requirements? Cranes 4
 
For more Manual Testing Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com