| Data flow testing is a control structure testing technique
where the criteria used to design test cases is that they
Option 1 Rely on basis path testing
Option 2 Exercise the logical conditions in a program module
Option 3 Select test paths based on the locations and uses
of variables
Option 4 Focus on testing the validity of loop constructs | | 1 |
| 1.What is mean by data base testing?explain with example?
2. you can check the data base testing through sql then why
we are using QTP Data base check ?
3.difference between modified waterfall model and waterfall
model?
4.defect life cycle?
| CTS | 2 |
| What is the difference between volume and load? | Gtech | 1 |
| What is Gorila testing? | AZTEC | 6 |
| wat are the questions would the project leader ask about
the project?? please do send the answers early. | | 3 |
| eqivalance testing class is made from data and this is made
to minimize the test cases and it is black box testing what
at which particular time we do this testing i guess while
creating test cases we consider this testing .plz if lett
me know if i am wrong | | 1 |
| When should testing start in a project? Why? | | 4 |
| what is bug tracebility matrix and it's formet? | | 2 |
| Whenever developer will recieved the defect from the
tester,then he will go thru the defect whether it is
acceptable or not?for that he will execute that application
again,while executing if he did not found any such type of
defect(what we are rise the defect above),then he will send
that defect to the corresponding tester with status
of 'reject',as a tester what we can do?(here writing the
reproduce steps and attached screen shots has been done by
tester while sending the defect to the developer, no need
to send reproduced steps and screen shots again) | CTS | 5 |
| give examples of incremental testing?
| Logica-CMG | 4 |
| Is Alpha Testing done by Testers or Developers? | | 6 |
| Any one pls describe master and visa card are same equity
or different. and is it possible have same card number
different expiry date with each master and visa. | iFlex | 2 |
| What is the role of a bug tracking system? | | 2 |
| The company has software running in its production
environment that was designed and tested on its quad-
processor servers with 16 GB of RAM. In order to meet
budget constraints, its disaster recovery plan calls for
this same software to be installed on functionally
identical servers, which are dual-processor with 12 GB of
RAM. The test group has been tasked with confirming that
the software is going to work on the hardware proposed in
the disaster recovery plan.
-what testing types is being used in the scenario above? | | 1 |
| Hai Friends! anybody atteded the interview in Covancys pls
tell me what is the question's they are asking in interview
(HR and Writen Test)? URGENT | | 1 |
| What is code coverage? | 3i-Infotech | 2 |
| Hi anybody can answer this question with example. giving as
it is i faced in interview.................
What is TestPhase? What are Entry and Exit Criterias?
Should explain with Example. | Ness-Technologies | 4 |
| What is the outcome of integration testing | | 1 |
| What is the input for System testing? | | 5 |
| |