ALLInterview.com :: Home Page KalAajKal.com
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
info       Did you received any Funny E-Mails from your Friends and like to share with rest of our friends? Yeah!! you can post that stuff   HERE
Google
 
Categories  >>  Software  >>  Testing  >>  Manual Testing
 
 


 

 
 Automation Testing interview questions  Automation Testing Interview Questions
 Manual Testing interview questions  Manual Testing Interview Questions
 QA Concepts interview questions  QA Concepts Interview Questions
 Mobile Testing interview questions  Mobile Testing Interview Questions
 Test Cases interview questions  Test Cases Interview Questions
 Test Documents Reporting interview questions  Test Documents Reporting Interview Questions
 Testing AllOther interview questions  Testing AllOther Interview Questions
Question
What it RTM and what are the columns in that matrix, 
anybody can explain it, Thanks in advance..
 Question Submitted By :: Raju
I also faced this Question!!     Rank Answer Posted By  
 
  Re: What it RTM and what are the columns in that matrix, anybody can explain it, Thanks in advance..
Answer
# 1
In a SDLC the Requirement traceability matrix is a document 
that correlates high-level requirements (sometimes known as 
marketing requirements) and test plan, and test cases. This 
matrix provides a very high level view of test coverage 
across the requirements.
 
Is This Answer Correct ?    0 Yes 0 No
Gnpsu01
 
  Re: What it RTM and what are the columns in that matrix, anybody can explain it, Thanks in advance..
Answer
# 2
Hi,
RTM is nothing but a Requirment Tracebility Matrix which is 
a documrnt , contains the columns like BRS ID,FS ID,Test 
Caase Id,Test case Status ,Defect Id,defect Status ,Assign 
to and Remarks....
Acrually RTM is Used for mapping the rquirments with the 
testcases...and to find the root cause of the bug....
The main aim of the RTM is to add a new requirmnet in the 
existing software....
This is a document share by TL and BA
To find out root cause of the bug we will use Backward 
direction(right to left) by TL
To map the requiremant with testcases we will use forward 
direction (left to right) by BA...

Correct me if i am wrong...
Venkat Reddy Bandaru.
 
Is This Answer Correct ?    0 Yes 0 No
Venkat Reddy Bandaru
 
 
 

 
 
 
Other Manual Testing Interview Questions
 
  Question Asked @ Answers
 
I am sayyad(frm hyd) new commer for this site? I have some doubt's pls clarify it..... I finished my MCA 2005 pased out),(sayyadmeer@gmail.com) and S/w Testing Course(2006) till now i didn't get any job in testing, I did not have any experience in real time projects. Any body can send me the sample Testcases,Srs,for Banking,ERP Projects etc. Advance thanks to all  5
what is "test strategy"?  4
what is difference between report defect and track defect  5
What is diff between Load testing Stress testing? TCS5
Difference between Equalance class partion and boundary value analysis? Patni9
PLEASE PLEASE READ IT FULLY & HELP ME... IT IS VERY URGENT.... Hi all, I passed my engg in May,2006 and joined an IT Company in May,2007 ,one year later as a fresher.Now I have almost 9 months of so-called experience.... I already have a fake experience certificate of 11 months given by a small company but they dont have such projects which I can show in my resume... Becoz of some personal problems I am planning to leave my current IT company and to give interviews in companies in or near my native place during May-June 2008 after the completion of 1 year in the current company... So one problem is that I want to show a project in my resume for my fake 11 months experience in interviews with explaining my work and another major problem is that out of these 9 months in my current company,2.5 months I was given training and then out of the rest 6.5 months, I worked only for 1.5 months as a TESTER that too for a small internal project...So I dont have any actual work experience in my project (insurance-specific)... and I am planning to show total experience of 23-24 months in those interviews which I'll appear now........ So I want the complete details of any 2 projects to show in my resume and to explain/answer in the interviews...One for 11 months' fake experience and another LIFE INSURANCE-specific(or like that) project for my current company's experience...As for my current company's experience in the resume,I can give the details of that fake INSURANCE project keeping my original client name and project name intact to avoid any possible problem in future...NO MATTER WHETHER THE PROJECT IS LARGE OR SMALL....But it should look like covering 9-10 months of my service in the company or it should look like that atleast for most of the time for my duration in the project,I was working(atleast for 6-7 months)....But it should be very easy... :-) So I want you guys to help me in providing me with 2 projects, one of them must be a LIFE INSURANCE type project.....Also the projects should be easy to understand and easy to explain my testing work in interviews...I want to present myself as a TESTER in those interviews..... My email id is mysticamagic84@gmail.com...Also give me all the possible,in depth and tricky questions related to the projects which U'll send me.... U can also give me the addresses of websites providing such fake projects.... Please help me becoz anyhow I'll have to shift to any company in or near my native place in May-June... Kindly help me in this problem...It is very urgent..... please let me know in reply to this post if U have sent anything in my email id... :-)  6
How to crash or break the web-based application  2
What is B.V.A with brief example? Anovatek4
what is the difference between Test case and Test scenario? is it necessary to prepare scenarios before writing test cases?explain in detail. Tekra16
There are so many big companies like Reliance, Satyam, Infosys etc...But, y do u want to work for our company only? Tanla-Solutions3
How do you know when the product is tested well enough?  2
Mapping the test cases with the requirement. What is this process called? iSoft6
what are the conditions of test cases?  4
Whenever the project is at maintenance phase the client will be using his own data- is the same data given to the test engineers or any other dummy data Circle-Source2
What was early release of Quality centre called? ITC-Infotech2
1)what are techniques used for writing the Test case?  5
How do you go about testing a project ?  2
Contents in Tracebility matrix? JVS12
EXplain the diffeenet types of bugs..... GE6
What are the prototypes are used during the integration testing ?Explain the stub and the driver in details?Are the stub and the driver both are used in top-down and the bottom-up approaches ? CitiGroup3
 
For more Manual Testing Interview Questions Click Here 
 
 
 
 
 
   
Copyright Policy  |  Terms of Service  |  Help  |  Site Map 1  |  Articles  |  Site Map  |   Site Map  |  Contact Us interview questions urls   External Links 
   
Copyright © 2007  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  Forum9.com   ::  KalAajKal.com