WHAT IS SETUP TIME,OPERATION TIME
SET UP TIME:THE TIME TO MAKE FIRST ACCEPTED PIECE WHICH INCLUDES BRINGING ALL THE TOOLS ,JIGS AND FIXTURES,SETUP THOSE JIGS ETC;FOR PARTICULAR BATCH QUANTITY. WHERE AS OPERATION TIME IS THE TIME WHICH WILL BE THE TIME TO COMPLETE EACH.
time require to to make setting time requre to complete operation
technical test papers, mechanical
Setup time is the time required to bring an action into ready state. Operation time is the total time taken to complete the operation of the setup.