ALLInterview.com :: Home Page KalAajKal.com
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Do you have a collection of Interview Questions and interested to share with us!!
Please send that collection to along with your userid / name. ThanQ
Google
 
Categories  >>  Software  >>  Testing  >>  Manual Testing
 
 


 

 
 Automation Testing interview questions  Automation Testing Interview Questions
 Manual Testing interview questions  Manual Testing Interview Questions
 QA Concepts interview questions  QA Concepts Interview Questions
 Mobile Testing interview questions  Mobile Testing Interview Questions
 Test Cases interview questions  Test Cases Interview Questions
 Test Documents Reporting interview questions  Test Documents Reporting Interview Questions
 Testing AllOther interview questions  Testing AllOther Interview Questions
Question
Is there any template for Test case review? or if it is, 
include it?
 Question Submitted By :: Rajapages
I also faced this Question!!     Rank Answer Posted By  
 
  Re: Is there any template for Test case review? or if it is, include it?
Answer
# 1
There isn't any specific template for Test case review.
Reviews are done by QA Lead. Test case review contains
following fields:
1. Date of Review
2. Project ID
3. Reviewer Name
4. Reviewee Name
5. Review / Inspection Issues
6. No. of Major issues (if found)
7. No. of Minor issues (if found)
8. No. of GUI issues (if found)
9. No. of critical issues
10. Signature of the Reviewer & Reviewee
 
Is This Answer Correct ?    0 Yes 0 No
Harjeet Kaur
 
  Re: Is there any template for Test case review? or if it is, include it?
Answer
# 2
Hi,

The test cases are reviewed by the Test Lead or Senior Test 
Engineer who has a good knowledge of the project 
requirements or in case of product testing good hold on the 
product behavior. 

Well in a test case review doc following are mentioned in 
general.

1. Project Name and Project Managers Name
2. Test Case Doc name
2. Date of Review
3. Reviewer's Name
4. Test engineer name(Author's Name)
5. Missing Test cases(Test cases which need to be added)
6. Missing test scnerios to be included.
7. Testcases which are not required and should be removed
8. Faults in Test case doc Formating, wrong language or 
grammer mistakes etc

Note: The review process and contents differs from company 
to company but above are the basic things found in review 
doc.
 
Is This Answer Correct ?    0 Yes 1 No
Smaranika
 
 
 

 
 
 
Other Manual Testing Interview Questions
 
  Question Asked @ Answers
 
which is the most important test case on the login page ? GE8
what is test report? Semantic-Space4
What is HTTP and TCP/IP AZTEC3
in SDLC where Exactly testing peoples r inveloved ? plz reail timers only.........(Usha) CTS7
diff b/w waterfall model & spiral model? Wipro6
I am sayyad(frm hyd) new commer for this site? I have some doubt's pls clarify it..... I finished my MCA 2005 pased out),(sayyadmeer@gmail.com) and S/w Testing Course(2006) till now i didn't get any job in testing, I did not have any experience in real time projects. Any body can send me the sample Testcases,Srs,for Banking,ERP Projects etc. Advance thanks to all  5
1) In a software development project Spiral Model was Chosen as the development model. What is the best-suited reason for this? A)This model is the oldest and most widely used paradigm for software development. B)In this model users get the feel free the actual system and developers get to build something immediately. C)In this model risk analysis is done coupled with evolutionary S/W process model with the iterative nature of prototyping and controlled systematic aspects of water fall model D)This model combines elements of Classical model with this iterative philoophy of prototyping. Mind-Tree2
can anbody tell me wht are microsoft 6 rules Hoch-Technologies5
What is Smoke Testing  4
what is the difference between integration testing and end to end testing? Keane-India-Ltd1
After loging the bugs in bugzilla the developer fix the bugs and change the stautus to fixed then the tester verfiy the bug/functionality in application. The verification is going to happen with present version or comming/new version?  1
what is meant by Priority nad severity? Verizon11
Neelima, Can you please brief what are the 15 testing issues. I'm aware of 5 Software developement life cycle.  2
What is Change and configuration management repositoty Sierra-Atlantica1
what is meant by system test case HCL1
What is primary duty of tester ? Veritas14
if u find bug is duplicated is it needed to again log it .how do u find bug is duplicated using test director as a tool SAP-Labs1
Is an "A fast database retrieval rate" a testable requirement?  3
Hi,please help me out with my ques:as soon as the build we get from developer,how will we start testing?first all how the build we get (means which form)?who will install it in the system and how tl will assign us the work?  1
Where will you give the Reproduce option in Bug report? GE2
 
For more Manual Testing Interview Questions Click Here 
 
 
 
 
 
   
Copyright Policy  |  Terms of Service  |  Help  |  Site Map 1  |  Articles  |  Site Map  |   Site Map  |  Contact Us interview questions urls   External Links 
   
Copyright © 2007  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  Forum9.com   ::  KalAajKal.com