ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Sciences >> Health Pharma >> Health Pharma AllOther
 
 


 

 
 Pharmacy interview questions  Pharmacy Interview Questions (217)
 Lab Technicians interview questions  Lab Technicians Interview Questions (71)
 Health Pharma AllOther interview questions  Health Pharma AllOther Interview Questions (80)
Question
what is the diffirence between deviation and change control?
at what situations we can raise the deviation and change 
control
 Question Submitted By :: Health-Pharma-AllOther
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
deviation is not permant but change control is perment 
Is This Answer Correct ?    216 Yes 38 No
Nitin
 
Answer
# 2
deviations are two types one is planned deviation and
another is un planned deviation. Planned deviations are two
types one is tempery and another is permenent. tempery
deviations are approved by QA then u proceed. permenent
deviations are must be reviewed by releated departments and
approved by QA through change control procedure.

Regards,

Rambabu
 
Is This Answer Correct ?    176 Yes 46 No
Rambabu Komati
 
 
 
Answer
# 3
Change control is a planned activity to bring about changes
in document/process/method.It can be for shorter period of
time or it can be permanent. It must be intimated to all
the concerned departments for official approval of Change
Control.
Deviation is an aberration from the given procedure which
is done intentionally or unintentionally. A deviation can
be divided into critical & non critical. Effects of
critical deviations should be assessed through
investigation & Corrective & Preventive Actions.
 
Is This Answer Correct ?    115 Yes 10 No
Yatin Ajgaonkar
 
Answer
# 4
DEVIATION MEANS - YOU ARE NOT FOLLOWING THE WRITTEN
DOCUMENTED PROCEDURS-MEANS U HAVE ALREADY THE SYSTEM FOR
HANDLING PARTICULAR THING OR EVENT BUT U R NOT FOLLOWING IT
MAY BE PLANNED OR UNPLANNED
BUT IN CASE OF CHANGE CONTROL U R CHANGING THE PROCEDURE
COMPLETLY STATING THAT THE CHANGED PROCEDURE IS THE FINAL
DOCUMENTED PROCEDURE AND ANY VIOLETION FROM IT IS TREATED
AS DEVIATION
 
Is This Answer Correct ?    47 Yes 9 No
Ashish Saxena
 
Answer
# 5
There are two typpes of deviation one is minor and anaother
is critical, minor deviation is approved by QA where as
Critical Deviation are filled by Concerned departments with
Corrective and preventive Action, than it is reviewed by
Head-API and R&D and put their comments and finally
reviewed and approved by QA for any particular Batch.

Change Control Proposal denotes any permanant and temporary
change in process/equipements or method and before raising
the CCP it should be data oriented along with proper
Justification and Corective and preventive action.If
changes are critical than technical group i.e.President and
Regulatory Head are also involved for this.
 
Is This Answer Correct ?    41 Yes 16 No
Atul Asthana
 
Answer
# 6
Deviation is a process in which we have to perform a task
that is not mentioned in the SOP, Change control is a
procedure in which we have to make a permanent change in
the Document, procedure or method, by raising 3 consective
deviations which is approved by the concerned departments
ane authorised by QA.
 
Is This Answer Correct ?    25 Yes 6 No
Sanjeev Kishore
 
Answer
# 7
Deviation is temporary and it is two types one is plan
deviation another is unplaned deviation. Unplaned deviation
is occure suddenly.

Change controle is a proposal that change in any
process,equipments or method. But it approved the comments
of all department which are related to this change.
 
Is This Answer Correct ?    38 Yes 21 No
Vipin
 
Answer
# 8
Deviation is a process in which we have to perform a task
that is not mentioned in the SOP, Change control is a
procedure in which we have to make a permanent change in
the Document, procedure or method, by raising 3 consective
deviations which is approved by the concerned departments
ane authorised by QA.
 
Is This Answer Correct ?    23 Yes 13 No
Ankur Sharma
 
Answer
# 9
Change control is documentary evidence for approval,
rejection and implementation any process, system or new things.
Requirements of CC: when initiating any new thinking this
is approvment the existing system.
Deviation: Departure from writing down procedure, system
which is design during initially stage.
 
Is This Answer Correct ?    3 Yes 1 No
Mukesh Tiwari
 
Answer
# 10
Deviation: Departure from the approved manufacturing
process/SOP/Systems shall be considered as a deviation
management system. This is an unexpected event occurring
which is out of control. The concept of Planned deviation
is wiped out long back. There is no planned deviation as
such. As planned deviation is a non compliance to the
approved process/SOP/Systems.

Change control System: Any change in the process/SOP/Systems
shall be changed from approved Change Control Procedure.
Change control procedure denotes permanent change and
temporary changes. After getting assessment from CFTs & QA,
change can be implemented by validating the procedures. If
there are any discrepancies identified at the
initial(Validation stage), immediately this can be revert
back to the original state by closing the change control and
stated as not approved. If found no discrepancy this
temporary change control shall be approved and converted
into a permanent change. Some change controls can be made
permanent when we know the
 
Is This Answer Correct ?    2 Yes 0 No
Santhosh Matam
 

 
 
 
Other Health Pharma AllOther Interview Questions
 
  Question Asked @ Answers
 
what is the difference between BirdFlu and Common flu?   2
what is the disintegration time of mouth dissolving tablet Unimarck-Pharma 2
IF We have to autoclave two chamber of media one having temp 100 c and onather at RT,which one get autoclaved first?   1
Assume that you've been hired for the position. A mother calls and says her child is sick and she needs an appointment this morning. You don't have an open appointment for the morning. What will you do?   1
How to register or submit drug master file to any regulatory agency?   2
what is a differance between drug purity and drug potency?   5
what is the diffirence between deviation and change control? at what situations we can raise the deviation and change control Ranbaxy 21
What is the differance between change deviation and change controle with respect to QA? Wockhardt 3
Which is the best Institute for Clinical Research, Clinical Data Management and Pharmacovigilance in Hyderabad?   5
What is the difference between Deviation and Out of Specification ?   2
what is dossiar ? How can I submit to the regulatory department ?   1
What are the foods gets Vitamin B19?   1
 
For more Health Pharma AllOther Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com