Qa is quality assurance. the main responsibility of a QA member is to ensure
that the standards r followed and to develop the methods as to make the
software development process smooth and to prevent the bugs from ever
ocurring.
QC is quality control. the main responsibility of a QC member is to find the
bugs, find them as early as possible and make sure that they get fixed.
Quality Assurance : A set of activities designed to ensure
that development and maintaince process is adequate to
ensure the system will its requirement. Qa is done by QA
member. Its to ensure that process is defined and
appropiate .QA rewie will focus on the process elements of
projects. Eg whwther req are defined at proper level or not.
Quality Control : A set of activities designed to evaluate
a developed work product. Focus on the Product oriented.
focus on finding defects in specific deliverables -e.g.,
are the defined requirements the right requirements
Both above two answer are correct but in short we can say
Quality assurance is a verification phase while
Quality control is a validation phase.
Plz correct me if i m wrong...
Regards..
Lokesh Kumar Chauhan
lokesh_kumar_chauhan@yahoo.com
Mobile - 09350229669
Noida
Quality Assurance : It is a proces in which every role and
his responsibilities are monitored and guided in such a way
that he accomplishes the task as per guidelines and quality
standards to provide quality of the product at the end.
Quality assurance is also called as Verification.
Quality Control : It is a process in which inspections and
auditings performed on the roles and responsibilities to
segregate bad process and elements from good ones. It is a
one type of controlling process. Quality control is also
called as validation.
Quality Asurance veryfy the all documents
Quality Control to check the application as per requiremant
QA done in pre_execution period
QC done in post_execution period
QA done by Quality Analiser
QC done by Tester
QA-Quality assurance is a planned and systematic pattern
for all action necessary to provide adequate confidence
that the item or product confirms to eshtablish technical
requirement.
QC-In the quality control we compares the product with
application standard is to ensure tha all quality
requirements are being met.
---- c.surana82@gmail.com(09986697771)
To say more clearly related to the answer posted by Lokesh
chauhan The verification phase includes information
gathering,Analysis,design and the coding
the validation phase includes system testing and maintenence.
Can anybody help me by sharing some knowledge on software
testing life cycle, how testing process done under
UT,IT,ST,PT,UAT.?please explai me briefly regarding this.