ALLInterview.com :: Home Page KalAajKal.com
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
tip   SiteMap shows list of All Categories in this site.
Google
 
Categories  >>  Software  >>  Testing  >>  Manual Testing
 
 


 

 
 Automation Testing interview questions  Automation Testing Interview Questions
 Manual Testing interview questions  Manual Testing Interview Questions
 QA Concepts interview questions  QA Concepts Interview Questions
 Mobile Testing interview questions  Mobile Testing Interview Questions
 Test Cases interview questions  Test Cases Interview Questions
 Test Documents Reporting interview questions  Test Documents Reporting Interview Questions
 Testing AllOther interview questions  Testing AllOther Interview Questions
Question
difference between bug reporting and bg tracking
 Question Submitted By :: Ranjini
I also faced this Question!!     Rank Answer Posted By  
 
  Re: difference between bug reporting and bg tracking
Answer
# 1
Bug tracking = I found a bug in 1 functionality. I am 
writing in a bug sheet document which i maint for all the 
bugs for that particular test script . 
Bug reporting = I am assigning bug to a developer who will 
fix it.
 
Is This Answer Correct ?    0 Yes 0 No
Yogesh Bhadane
 
  Re: difference between bug reporting and bg tracking
Answer
# 2
Bug tracking: after found a bug it will documented its 
called bug tracking(example:where is the bug found like 
that)
bug reporting:After found any bug it will send to our team 
leader. Its called a bug repoting.
 
Is This Answer Correct ?    0 Yes 0 No
Nathiya
 
 
 
  Re: difference between bug reporting and bg tracking
Answer
# 3
How to report a bug?

It’s a good practice to take screen shots of execution of
every step during software testing. If any test case fails
during execution, it needs to be failed in the bug-reporting
tool and a bug has to be reported/logged for the same. The
tester can choose to first report a bug and then fail the
test case in the bug-reporting tool or fail a test case and
report a bug. In any case, the Bug ID that is generated for
the reported bug should be attached to the test case that is
failed.

At the time of reporting a bug, all the mandatory fields
from the contents of bug (such as Project, Summary,
Description, Status, Detected By, Assigned To, Date
Detected, Test Lead, Detected in Version, Closed in Version,
Expected Date of Closure, Actual Date of Closure, Severity,
Priority and Bug ID etc.) are filled and detailed
description of the bug is given along with the expected and
actual results. The screen-shots taken at the time of
execution of test case are attached to the bug for reference
by the developer.

After reporting a bug, a unique Bug ID is generated by the
bug-reporting tool, which is then associated with the failed
test case. This Bug ID helps in associating the bug with the
failed test case.

After the bug is reported, it is assigned a status of ‘New’,
which goes on changing as the bug fixing process progresses.

If more than one tester are testing the software
application, it becomes a possibility that some other tester
might already have reported a bug for the same defect found
in the application. In such situation, it becomes very
important for the tester to find out if any bug has been
reported for similar type of defect. If yes, then the test
case has to be blocked with the previously raised bug (in
this case, the test case has to be executed once the bug is
fixed). And if there is no such bug reported previously, the
tester can report a new bug and fail the test case for the
newly raised bug.

If no bug-reporting tool is used, then in that case, the
test case is written in a tabular manner in a file with four
columns containing Test Step No, Test Step Description,
Expected Result and Actual Result. The expected and actual
results are written for each step and the test case is
failed for the step at which the test case fails.

This file containing test case and the screen shots taken
are sent to the developers for reference. As the tracking
process is not automated, it becomes important keep updated
information of the bug that was raised till the time it is
closed.
 
Is This Answer Correct ?    0 Yes 0 No
Sreedevi
 

 
 
 
Other Manual Testing Interview Questions
 
  Question Asked @ Answers
 
What techinques do you follow during testing?  3
What is TEST PLAN, TEST STRATEGY, TEST SCENARIO, TEST CASE, TEST SCRIPT? can any body give me definition with example.  1
Give practical example for implementing V-Model  2
2. The prime benefit of testing is that it results in improved defects a. True b. False  4
What is the difference between software Product and Project AppLabs9
What is a Test Log ,How is it differnt from a bug REport  2
What is known Issue??? Yordlee5
question about bug is valid or invalid ? suppose i don't have srs i want suggest close button in one form but the developer says client no need that one in this situation the bug is valid or invalid?  2
what tests U'll do when u r doing web testing  3
what is realibility  1
Hi, I am new to testing.where we will use SQL in manual testing. To what extent i need to learn SQl.there are diff types of SQL like TSql,Mysql etc.i little bit confused,help me. Thank you .  2
Differentiate Defect age and Build interval.  2
can u tell me some bugs in any banking application.  1
What is bidirectional traceability?  3
What is meant by the bug state "Reproduce" Oracle9
how load testing is different from regression testing? Millennium4
You have URL address it is opening fine with your team member system but it is not opening in your system browser? How will you come across? AZTEC3
Hi, Can anybody tell me what is Boundary value analysis, equivalence partitioning and error guessing with examples?  3
Hi freinds..im priyan 4rm banglore. i recently got an job on 2+(manual testing) by faq experience.in 2 days im going 2 join in company. now, can u any tel me pls how s there n company & environment. and what work did they give for me in starting & vat work shal i do there..? pls give me reply & help me soon. pls dont mind.  2
The scenario is "while reviewing requirement docs(SRS)if u find or feel any requirement is not meeting the client's requirements" whom do you report?and what is your action?  7
 
For more Manual Testing Interview Questions Click Here 
 
 
 
 
 
   
Copyright Policy  |  Terms of Service  |  Help  |  Site Map 1  |  Articles  |  Site Map  |   Site Map  |  Contact Us interview questions urls   External Links 
   
Copyright © 2007  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  Forum9.com   ::  KalAajKal.com