ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Electrical Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3073)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3287)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13323)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2364)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (416)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (79)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (163)
 Instrumentation interview questions  Instrumentation Interview Questions (2375)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (106)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (43)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (75)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1196)
Question
11kv/0.433kv, 2 mva , transformer , for protection and 
metering how many CT/PT are required?
 Question Submitted By :: Electrical-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
1 CT WITH 3 CORE
1st CORE FOR O/C & E/F PROTECTION
2nd CORE FOR METERING WITH INSULATION CLASS 0.5
3rd CORE FOR DIFFERENTIAL PROTECTION
1 PT WITH 2 CORE
1st CORE FORE O/C & E/F PROTECTION
2nd CORE FORE METERING
 
Is This Answer Correct ?    10 Yes 3 No
Shailesh Taware
 
Answer
# 2
3 ct for metering ,3 ct for protection,3 pt 
Is This Answer Correct ?    11 Yes 5 No
Rakesh
 
 
 
Answer
# 3
one set of tertiary winding CT/PT is sufficient for both
metering and protection.
 
Is This Answer Correct ?    11 Yes 7 No
Manjunath Kunigal
 
Answer
# 4
3 nos of CT/PT required 
Is This Answer Correct ?    6 Yes 3 No
Priyadharisini
 
Answer
# 5
3 CT/1 PT 
Is This Answer Correct ?    5 Yes 4 No
Sandeep
 
Answer
# 6
06CT and 03PT'S 
Is This Answer Correct ?    3 Yes 2 No
Senthil Kumar
 
Answer
# 7
hi,
one three phase set of PTs for both protection & metering
and one three phase set of CTs with two secondary cores one
for metering and protection are required.
 
Is This Answer Correct ?    1 Yes 0 No
K N Naidu
 
Answer
# 8
You need:

1)Inst., o/c, Metering & EF - 3 CT's

2) REF - 1 CT

3)SBEF - 1 CT
 
Is This Answer Correct ?    1 Yes 0 No
Mubanga Mulenga
 
Answer
# 9
3 no CT (Double core) for 11 kv side for protection and
metering
3 no CT (Double core) for 0.433 kv side for protection and
metering
11/.110 KV 3 phase PT for 11 KV side
secondry side(.433KV side) phase directly connected for
Metering & select relays for .433 KV secondry voltage.
if you select differencial rotection
3 nos CT for Primary and 3 No CT for Secondry side and
interposing CT for Match and neutralise the current in
relay.
 
Is This Answer Correct ?    1 Yes 0 No
Vikas Chauhan
 
Answer
# 10
11KV side(delta)
Line side 3core CT :1No. for metering, O/C&E/F protection,
Differential protection with ICT.

0.433KV(Star)
Nuetral CTs :1core for Standby E/F 5p20
Line CTs :3core CT:1No for metering, O/C&E/F
protection,Differential protection with ICT.

1No. 1-core CT in LV nuetral of Transformer of class 5P20
for earth fault protection.

panel side in the panel itself remaining CTs can be
provided for metering, O/C&E/F, and differential cores with
ICT. In both HV panel & LV panel.
 
Is This Answer Correct ?    2 Yes 1 No
D Ramesh
 

 
 
 
Other Electrical Engineering Interview Questions
 
  Question Asked @ Answers
 
what is wave trap? And how it works?   3
what is the different between RCCB & ELCB   3
Current chopping mainly occurs in air blast circuit breaker.why?   1
Define current?   14
pls send me some of the solved question booklet of Junior Engineer -2 (ELE) in RRB RRB 1
why series motor cannot be started on no-load?   6
What happen to alternator if prime mover fails?   4
Why DC Currents are not used in transformer?   4
which motor is suitable for traction? why? KPCL 13
Elaborate the term "rotating magnetic field" APTRANSCO 1
what is the difference between AC choke (inductor) and DC choke (inductor), working and design point of view? Electrotherm 2
help!!!! i bought a new house 2 yrs ago,ive just had 2 new lights fitted,when i boil the kettle,maybe 2 times in succession the safety light switch trips out,it dosnt do it straight away but it seems to do it when the kettle boils!!!!! sounds very odd to me   1
 
For more Electrical Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com