Verification typically involves Reviews to evaluate
documents,plans,code,requirements and specifications.This
can be done with check lists .walkthrouhs and inspections.
Validation typically involves actual testing and takes place
after verification
Verificatio is nothing but to check whether our apllication
si based on corresponding specifications or not?
Validation is nothing but to check whether our apllication
ifuinctionality is equal to customer requirements or not?
verification is nothing but the process of checking the
product whether you are doing it in the correct way with
respect to requirements.
Validation- process of checking whether the developed
product is correct or not
verification is Defect-prevention oriented means before
going to actual testing we review the test plan documents,
test cases.
validation in defect-detection and correction oriented
means actual testing .
if it is wrong plz correct me.
verification is static and validation is dynemic
in verification no need to excute code,while in validation
need to excute code.
verification means are we going to build the system
right.and validation means you are build the right system
verification is the process before the build ready, i mean
conducting review on BRS, SRS, HLD, LLD's this process is
called verification, it is process level, done by
developers.
validation is conducting testing on build- integration
testing,unit testing, system testing, UAT. This is
completion level.
This is my opinion.
verification is the process which checks whether the
application meets specifications given by the customer
other name for this is review
validation is the process where it satisfy the business
scenario
hi friends, anybody WHO NEEDS PROPER GUIDANCE TO MAKE
CARRER IN TESTING PLS CONSULT ME. U WILL DEFINITELY BE
BENEFITTED. My EMAIL ID: sun2k8@rediffmail.com Test Lead
(IBM) +919902925787
we are writing bug report in excel-sheet how you are
sending the report to your concern person. (give me the
detail work from bug found, where you are storing and how
you are sending related to your company)
winrunner q's..(if winrunner
1.explain types of recording modes?
2.how winrunner recognize GUI objects?
3.what is there in GUI map editor?
4.explain types of checkpoints?
5.syncronization point?
6.diff. between wait st. and synchornization?
7.diff.between is treturn & texit?
8.diff between tl_step and report_msg?
9.what is data driven test?
10how we parameterize the variable?
11.some ddt commands?
12.why we need to automate ?
13.explain database checkpoints with connectivity?
14.diff..between compiler module and main script?
15.expain in,out,inout parameters?
16.function generator?
17. Search path,breakpoints?
18.diff between step,step in,step out?
The following questions were asked me at the HCL...Please
try to
answer these:::
1Q: For 3rd party fund stransfer through online bankinghow
much time
it take..? What are the processes behind that..?
You need to plan a test project to qualify an application
composed of many individual components.
Referring to the scenario above, which phases do you expect
to take longer than usual?
Hi Friends ,
I am 1 year experience Manual tester and i want to do any
certification but i dont know any thing about it. please do
suggest me.
Thanks in advance