ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Software >> Testing >> Manual Testing
 
 


 

 
 Automation Testing interview questions  Automation Testing Interview Questions (5206)
 Manual Testing interview questions  Manual Testing Interview Questions (6493)
 QA Concepts interview questions  QA Concepts Interview Questions (656)
 Mobile Testing interview questions  Mobile Testing Interview Questions (115)
 Test Cases interview questions  Test Cases Interview Questions (469)
 Test Documents Reporting interview questions  Test Documents Reporting Interview Questions (58)
 Testing AllOther interview questions  Testing AllOther Interview Questions (609)
Question
what is the difference between V model and Waterfall model 
used in SDLC?
 Question Submitted By :: Manual-Testing
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
Waterfall Model: It includes all phases of SDLC but the
drawback is once requirement made freezed it cannot be
changed.

V-Model: In this model all phases will be done
correspondently development and testing etc.....
 
Is This Answer Correct ?    77 Yes 13 No
Pratap
 
Answer
# 2
In Waterfall model,testing is carried out once the code has
been fully developed.Each work-product or activity is
completed before moving on to next.

In V-model,gives realtionship between each development
stages and Testing stages.
Once the basis for testing has been produced ,planning and
prepration can begin
 
Is This Answer Correct ?    53 Yes 13 No
Rabindra
 
 
 
Answer
# 3
As most of you have said, In the waterfall model each sterp
is frozen before the next step. that is the requirements
are frozen before the design starts, and once the design is
frozen the coding starts etc. But what will the testing
team do till then?????
In V model, based on the requirements the System test
cases are prepared, and based on the HLD (High level
document)the Integration Test cases are prepared, and based
on the LLD(Lowlevel document)the Integration Test cases are
prepared. and then the coding is done. once coding is
completed, unit, integration and system testing happens in
the sequence.
 
Is This Answer Correct ?    38 Yes 11 No
Arun
 
Answer
# 4
in v model developer and tester works paralally.in the case
of waterfall model it's not possible.In the case of
waterfall model after finishing off all the models tester
start testing
 
Is This Answer Correct ?    25 Yes 8 No
Nisha
 
Answer
# 5
waterfall model-waterfall model is very time consuming and
high costing......



v-model-v-model is not to much time consuming and high
costing and it is a process oriented
 
Is This Answer Correct ?    17 Yes 13 No
Arjun Chadha
 
Answer
# 6
Differences In V-Model and Waterfall Model
In Waterfall Model the tester role will take place only in the test phase but in V-Model role will take place in the requirement phase itself
Waterfall madel is a fixed process u can't make any changes in the requirement or in any phase.but in V-Model u can make any changes in the requirements
V-model is the simultaneous process but it is not in case of water fall model
waterfall model used only the requirements are fixed but V-model can be used for the any type of requirement(Uncertain requirement)
 
Is This Answer Correct ?    5 Yes 1 No
Siddhesh
 
Answer
# 7
In Waterfall, testing will be done only after the software product is completely build.
In V model testing will be done in each phase of s/w development life cycle.
 
Is This Answer Correct ?    4 Yes 1 No
Chaithra
 
Answer
# 8
V model satges:
1.component testing
2.integration Testing
3.System Testing
4.acceptance Testing
Waterfall model stages:
1.User Requerement
2.System Requirement
3.global Design
4.Detailed Design
5.Implementation
6.Testing
 
Is This Answer Correct ?    6 Yes 39 No
Neha Shrivastava
 
Answer
# 9
generally speaking waterfall model is used for desktop
applications and v-model is used for both desktop and web
based applications
 
Is This Answer Correct ?    26 Yes 61 No
Neelima
 

 
 
 
Other Manual Testing Interview Questions
 
  Question Asked @ Answers
 
What are W3C Standards?   2
what is the meaning of the negative testing?   7
wht is change management and configuration management?   2
I want to know the real time cycle i.e SDLC.(First of all Buisness logic is prepared,but doesn't know by whom and with the help of whom?)Similarly what are the next steps (the persons involved) and connection in between the steps. Quexst 5
Advantages and Dis-advantages of V-model?Is every company is using V-model only? pls send me the answer very quick asap.   8
what is the Diff between UAT and QA? Cap-Gemini 4
This is the question related to Traceability Matrix. Say we have 10 requirements for a project. If one of the testing team member misses the 9th requirement. Then how can we justify the Traceability Matrix and what is the further action to be taken. Please advice. ACS 6
does tester use design document for writing testcases CMC 4
Principles of testing?   4
tell me about ur current proect? how can we start, what should we explain? should we expalin the entire proj or only our module? july27 brahma412@yahoo.co.in plz help me   4
performance testing is functional or nonfuctional   3
pliz anyone explain what is the DEFAULT BUG & also give me some example.Thanks in advance.. Mindteck 1
 
For more Manual Testing Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com