ALLInterview.com :: Home Page KalAajKal.com
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
tip       Ask Questions on ANYTHING, that arise in your Daily Life at     FORUM9.COM
Google
 
Categories  >>  Software  >>  Testing  >>  Manual Testing
 
 


 

 
 Automation Testing interview questions  Automation Testing Interview Questions
 Manual Testing interview questions  Manual Testing Interview Questions
 QA Concepts interview questions  QA Concepts Interview Questions
 Mobile Testing interview questions  Mobile Testing Interview Questions
 Test Cases interview questions  Test Cases Interview Questions
 Test Documents Reporting interview questions  Test Documents Reporting Interview Questions
 Testing AllOther interview questions  Testing AllOther Interview Questions
Question
what is advantages and disadvantages of the Waterfall Model
and V-Model
 Question Submitted By :: Naruboinac
I also faced this Question!!     Rank Answer Posted By  
 
  Re: what is advantages and disadvantages of the Waterfall Model and V-Model
Answer
# 1
WaterFall Model advantages:
                It is a linear sequestial model
                It is very simple model to implement
                It is the first model.
                It needs very few resources to implement
Disadvantages:
                In this model there is no back tracking.
                For example if any error occured an any
                stage of software development,it cann't be
                corrected in that build.

V-Model advantages:
                It is also called as verification and 
                validation Model.
                This means the verification and validation
                will be done side by side.
                It emphasies the strict process flow to 
                develop a quality product.
                The errors occured in any pahse will be
                corrected in that phase itself.
V-Model disadvantages:
                It needs lot of resources and money.
                It needs an established  process to 
                implement.
                It can be implemented by only some big
                companies.

Byeeee Friends

Rajendra 
rajendra_penumalli@yahoo.com
 
Is This Answer Correct ?    12 Yes 3 No
Rajendra
 
  Re: what is advantages and disadvantages of the Waterfall Model and V-Model
Answer
# 2
In the traditional waterfall model, testing is done at the 
end of the life cycle. The errors found at the later stages 
are very expensive to fix. This has given an idea to V 
model where in verification and validation are done at each 
stage of SDLC to avoid errors/defects getting cascaded to 
the other level. In other words V model aims for Stage 
containment.
 
Is This Answer Correct ?    14 Yes 0 No
Mercy
 
 
 

 
 
 
Other Manual Testing Interview Questions
 
  Question Asked @ Answers
 
What is the difference between functional test cases and business test cases?  2
what is test Harness?how it will help for testing?  4
can anyone tell me the different types of testing with starting letter A specify atleast 5 ?? eg: adhoc testing,alpha testing.  1
what is crud testing ? and who will do this one ?  3
Functional testing is the part of System testing or System testing is the part of functional testing IBM3
What are the possible test cases/test scenario for Search functionality ?  1
What is the difference between Functional and Technical bugs? Give an example for each. Geometric-Software3
we have develop one program i.e palindrome for string character to check whether that string is palindrome or not. example palindrome mean if u type ABCDCBA,RAAR..u can read it form start or u can read it from end u find same string... write the test cases for the above what u wil do for edges boundaries check wether the program is correct or not  2
Difference between the stress and load testing?  3
what r the GUI Test Cases for calculator? Accenture5
what is waterfall model?explain? what is v model? explain all phase?and the difference between two model? CTS3
DESCRIBE s/w quality assurence &s/w quality control Accenture4
9.Are you exposed to any automation tools?If yes your role? VJIL-Consulting2
what are the Levels of testing?  10
What is validation and verification? What is different between them? Nedbank7
Defect Migration "Defect Migration" means that error is early project documents lead to errors in later documents. For example, an incorrect requirement leads to an incorrect set of speacifications, which leads to design errors, which leads to coding errors, which lead to failures when we test against user expectations. a. How will you prevent Defect Migration? b. Why do you think preventing Defect Migration is important? ISB1
what is difference between severity and priority? what is difference between bug and defect? AD-Solutions14
Write test cases to copy text file from C:\ drive to D:\ drive?  1
At what stage unit testing has to be done?  6
in configuration tool as a tester wich documents u r going to add  2
 
For more Manual Testing Interview Questions Click Here 
 
 
 
 
 
   
Copyright Policy  |  Terms of Service  |  Help  |  Site Map 1  |  Articles  |  Site Map  |   Site Map  |  Contact Us interview questions urls   External Links 
   
Copyright © 2007  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  Forum9.com   ::  KalAajKal.com