This is a General question asked in all the Interviews
You start testing once you are clear with the requirements
amd the documnets are ready
You stop testing depending on the following factors
I am continuing The answer You stop testing when
stop testing these are the main factors.
1. Reduce in defects.
2. Increase in Testing cost.
3. Delivary dates.
We need to check that
1) Whether all the Bugs which were Assigned to developers
have been fixed .
2) All the documents pertaining to testing have been
prepared.
3) all the bugs which were in Previous releases have been
retested .
when bug rate falls below a certian level
when deadlines are reached
when all the testcases are passed with a certian rate of
passed testcases
when testing budget is depleted
and teamleader says to stop testing
in all these cases we stop testing
we will start testing when we have software requirement
specification, enough testcases, and build
we will stop testing
i)when all major seviority bugs are solved
ii)when budget is going to complete
iii)when project time s going to complete
why no hv mentioned abt the Test Plan -Exit Criteria.
while Test Plan is done we use to mention the Exit Criteria
Right,we shd Indentify that Exit Criteria also to Stop
Testing know?
When to start:
1)When build is ready
2)Environment is setup
3)Test cases are executed
4)Resource should be ready
when to stop:
1)Based on no. of test cases executed
2)No. of defect-reach certain low level
3)Based on release date
The following are the list of items that are required to be
Start the QA Phase.
.Complete Unit/ Integration Testing.
.QA Test Environment SetUp Completed.
.QA Test Plan Preparation Completed and approved.
.QA Test Cases Preparation Completed and approved.
The following are the list of items that are required to be
Stop the QA Phase.
. All Planned System Test cases have been executed.
. No Critical Bugs.
. Defect log should be updated.
. QA Test Summary Report Completed.
. QA Sign off.
can anybody explain me the role of QA in every phase of
SDLC (PHASE WISE) to privent from bug.with real life
example.1)requirement analy.2)designing 3)coding 4)testing
5)implementation 6)maintenance.
PHASE WISE