ALLInterview.com :: Home Page KalAajKal.com
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Do you have a collection of Interview Questions and interested to share with us!!
Please send that collection to along with your userid / name. ThanQ
Google
 
Categories  >>  Software  >>  Testing  >>  QA Concepts
 
 


 

 
 Automation Testing interview questions  Automation Testing Interview Questions
 Manual Testing interview questions  Manual Testing Interview Questions
 QA Concepts interview questions  QA Concepts Interview Questions
 Mobile Testing interview questions  Mobile Testing Interview Questions
 Test Cases interview questions  Test Cases Interview Questions
 Test Documents Reporting interview questions  Test Documents Reporting Interview Questions
 Testing AllOther interview questions  Testing AllOther Interview Questions
Question
When to start and Stop Testing?
 Question Submitted By :: Ramnagaraj
I also faced this Question!!     Rank Answer Posted By  
 
  Re: When to start and Stop Testing?
Answer
# 1
This is a General question asked in all  the  Interviews

You start testing once you are clear with the requirements 
amd the documnets are ready

You stop testing depending on the following factors
 
Is This Answer Correct ?    2 Yes 1 No
Sj1234
 
  Re: When to start and Stop Testing?
Answer
# 2
I am continuing The answer You stop testing when
stop testing these are the main factors.

1. Reduce in defects.
2. Increase in Testing cost.
3. Delivary dates.

We need to check that

1) Whether all the Bugs which were Assigned to developers 
have been fixed .
2) All the documents pertaining to testing have been 
prepared.
3) all the bugs which were in Previous releases have been 
retested .
 
Is This Answer Correct ?    1 Yes 1 No
Sj1234
 
 
 
  Re: When to start and Stop Testing?
Answer
# 3
when bug rate falls below a certian level
 when deadlines are reached
 when all the testcases are passed with a certian rate of 
passed testcases
 when testing budget is depleted
  and teamleader says to stop testing
   in all these cases we stop testing
 
Is This Answer Correct ?    0 Yes 1 No
Meenakshi
 
  Re: When to start and Stop Testing?
Answer
# 4
we will start testing when we have software requirement 
specification, enough testcases,  and build

we will stop testing 
i)when all major seviority bugs are solved 
ii)when budget is going to complete
iii)when project time s going to complete
 
Is This Answer Correct ?    0 Yes 1 No
Divya Nandana.b
 
  Re: When to start and Stop Testing?
Answer
# 5
why no hv mentioned abt the Test Plan -Exit Criteria.
while Test Plan is done we use to mention the Exit Criteria 
Right,we shd Indentify that Exit Criteria also to Stop 
Testing know?
 
Is This Answer Correct ?    0 Yes 1 No
Prince
 
  Re: When to start and Stop Testing?
Answer
# 6
When to start:

 1)When build is ready
 2)Environment is setup
 3)Test cases are executed
 4)Resource should be ready

when to stop:

1)Based on no. of test cases executed
2)No. of defect-reach certain low level
3)Based on release date
 
Is This Answer Correct ?    1 Yes 1 No
Prabha
 
  Re: When to start and Stop Testing?
Answer
# 7
The following are the list of items that are required to be 
Start the QA Phase.
.Complete Unit/ Integration Testing.
.QA Test Environment SetUp Completed.
.QA Test Plan Preparation Completed and approved.
.QA Test Cases Preparation Completed and approved.

The following are the list of items that are required to be 
Stop the QA Phase.
. All Planned System Test cases have been executed.
. No Critical Bugs.
. Defect log should be updated.
. QA Test Summary Report Completed.
. QA Sign off.
 
Is This Answer Correct ?    1 Yes 1 No
Sudhakar8
 

 
 
 
Other QA Concepts Interview Questions
 
  Question Asked @ Answers
 
what type of documents do u prepare during testing Semantic-Space7
What are the Qualities of a Tester?  3
contents of test stratergy? Ordain-Solutions1
Can any one tell me about the free online certifications in the QA and QC stream  1
What is Recovery Testing?  3
what is test plan? what are main thing for test plan? How does it work? What is testDirector? what are mazor componats of TestDirector?  1
anyone can explain about SixSigma process.  1
What are points should consider at the time of reviews? Covansys1
what is meant by QA milestones Virtusa1
how can u find system IP address  3
what is the difference between lifecycle model and v-model Semantic-Space6
can anybody explain me the role of QA in every phase of SDLC (PHASE WISE) to privent from bug.with real life example.1)requirement analy.2)designing 3)coding 4)testing 5)implementation 6)maintenance. PHASE WISE Aloha-Technology1
How do you train another QA engineer?  2
What are two of your strengths that you will bring to our QA/testing team?  1
what is Software testing?  6
What is Crystal Reports ? Accenture2
Interface Testing means?  3
WHAT IS QA PRINCIPLES? very urgent, can any body tell. In advance thank you.  1
at any application or software where the data will be stored at server side or at client side kindly answer it in detail?  1
What is Deffered? explain it who allocate it?  2
 
For more QA Concepts Interview Questions Click Here 
 
 
 
 
 
   
Copyright Policy  |  Terms of Service  |  Help  |  Site Map 1  |  Articles  |  Site Map  |   Site Map  |  Contact Us interview questions urls   External Links 
   
Copyright © 2007  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  Forum9.com   ::  KalAajKal.com