ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Software >> ERP CRM >> SAP >> PP
 
 


 

 
 Basis interview questions  Basis Interview Questions (812)
 ABAP interview questions  ABAP Interview Questions (2426)
 SAPScript interview questions  SAPScript Interview Questions (127)
 SD interview questions  SD Interview Questions (1948)
 MM interview questions  MM Interview Questions (350)
 QM interview questions  QM Interview Questions (8)
 PP interview questions  PP Interview Questions (136)
 PM interview questions  PM Interview Questions (21)
 PS interview questions  PS Interview Questions (20)
 FI CO interview questions  FI CO Interview Questions (1647)
 HR interview questions  HR Interview Questions (434)
 SAP CRM interview questions  SAP CRM Interview Questions (261)
 SRM interview questions  SRM Interview Questions (11)
 APO interview questions  APO Interview Questions (18)
 Business Warehouse interview questions  Business Warehouse Interview Questions (622)
 Business Workflow interview questions  Business Workflow Interview Questions (9)
 SAP Security interview questions  SAP Security Interview Questions (332)
 SAP Interfaces interview questions  SAP Interfaces Interview Questions (4)
 Netweaver interview questions  Netweaver Interview Questions (144)
 SAP ALE IDocs interview questions  SAP ALE IDocs Interview Questions (47)
 SAP B1 interview questions  SAP B1 Interview Questions (57)
 SAP AllOther interview questions  SAP AllOther Interview Questions (90)
Question
What are different MRP types?
 Question Submitted By :: PP
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
MRP type determines whether and how the material is
planned.For different requirement the different types are
available in SAP. "PD"for exploding the BOM & generate the
requirement."VB" for manual reorder point,"VM" for
automatic reorder point. etc.
 
Is This Answer Correct ?    104 Yes 14 No
Hemant Baviskar
 
Answer
# 2
There are many types of MRP types as
1}PD
2}M0
3}M1
4}M2
5}M3
6}M4
7}VB
 
Is This Answer Correct ?    59 Yes 16 No
Santosh K
 
 
 
Answer
# 3
there is one more type ND ,used for no planing generaly
used in by products.because u are not planing for it.
 
Is This Answer Correct ?    60 Yes 18 No
Mobeen Ahmad
 
Answer
# 4
The differnt types of planning procedures are

1. MPS - Master Production Scheduling

2. MRP - Material Reuquirements planning

3. Consumption based planning - (there are two types)
i) Forecast based planning

ii) Reorder point planning
a) Manual Reoderpoint planning
b) Automatic reorderpoint planning
 
Is This Answer Correct ?    43 Yes 13 No
Vadivel
 
Answer
# 5
# Master Production Schedule
# Material Requirement Planning
# Consumption Based Planning
Automatic reorder level planning
Manual Reorder Planning
 
Is This Answer Correct ?    37 Yes 13 No
V.ramachandran
 
Answer
# 6
1. MRP - PD: -

2. Consumption based planning: -
a. Re order point planning: - When the stock level
reaches the reorder point set taking RLT into
consideration, the procurment order is created
automatically without considering PIR or CIR.
b. Forcast based planning: - here procurment is based
on forecat.
c. Time based planning:- Here procurment is done in
regular interval.

3. MPS: - this is set for critical material which are
excluded from MRP.

4. NO MRP: -

5. MRP in external planning: - This is set when an
additional planning tool like APO is set and planning is
done in APO.
 
Is This Answer Correct ?    28 Yes 4 No
Animesh Kumar
 
Answer
# 7
MRP Type:
Key that determines whether and how the material is
planned. You have the following options:

Manual reorder point planning (VB)
Automatic reorder point planning (VM)
Forecast-based planning (VV)
Material requirements planning (PD)
No planning (ND)
Time phased planning (R1)
Master production scheduling (MPS)
THHANKS
 
Is This Answer Correct ?    16 Yes 2 No
Jinchandramule
 
Answer
# 8
there are one more type of MRP XO which planning can done
in APO and purches order in R/3.
 
Is This Answer Correct ?    18 Yes 7 No
Anand Patil
 
Answer
# 9
M0
M1
M2
M3
M4
ND
P1
P2
P3
P4
PD
R1
R2
RE
RF
RP
RR
RS
V1
V2
VB
VI
VM
VS
VV
X0
 
Is This Answer Correct ?    15 Yes 9 No
Miten Dalwadi
 
Answer
# 10
It can be classied into different ways
and there are not absolute answers.

My answer is two types:

1. Demand-driven MRP

2. Teamwork MRP
 
Is This Answer Correct ?    0 Yes 0 No
Niville Ho
 

 
 
 
Other PP Interview Questions
 
  Question Asked @ Answers
 
my scenario is repetitive manufacturing (REM) make-to-stock (MTS)production for sugar industry. What are the things, I have to customize for this scenario, to the PP point of view..   5
How you can implement new production order type?   2
what is standard info set? where it is used in pp? IBM 2
can any body tell me integration between pp with fi,mm,sd.   6
Integration of PP with MM , Integration of PP with SD . TCS 1
what are the costing parameter ? Accenture 3
what is varient BOM?   1
What are the common questions,asked at SAP PP Full time face to face interview?   1
Difference b/w Co-product & by-Product Wipro 6
Do you want to use one BOM to represent several similar materials (closed variant BOM)?   2
what is backflush? what are the benefits of back flush?   3
what is lead time, planning time, planning fence time ? TCS 6
 
For more PP Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com