| Other Testing AllOther Interview Questions |
| |
| Question | Asked @ | Answers |
| |
| what is qc&qa | Satyam | 7 |
| What is Extreme Programming (XP)? | Thought-Works | 1 |
| what is the difference b/w functional testing and system
testing? | | 4 |
| which testing we do during requirements?
a. white box testing
b. black box testing
c.both testing
d.none | | 6 |
| In a flat file there are multiple lines of records and each
record have some values are there and each is seperated by
a table. How can you upload these values into a table in
SQL Server | CybAge | 1 |
| How technological changes affects a project? | | 2 |
| What is TRM?
| TCS | 1 |
| hi frends
in qtp the result window blank sheet comeing
but the automation program is running
what i do to see result?
| | 1 |
| What is the major risk or challenge faced by you as QA
analyst other than clash with the developer regarding the
defect log. | | 1 |
| In an Testing interview the following question asked.
who will write usecases? | MBT | 4 |
| I'm in search of a test management system that can handle
the tasks for instance of a manager or a tester equally well
Can anyone help you in this?
| | 1 |
| What is a test plan? can we do without a test plan this was
askes in tcs interview pls tell me fast
by janaki | | 5 |
| Foundations of Software Testing by Dorothy Graham, Erik Van
Veenendaal,Isabel Evans ,Rex Black.
i need this e-book
please help me it is very urgent | ISTQB | 2 |
| hi,what are the weaknesses of jasper report . While testing
jasper report what is most important thing to test , where
there are maximum chances of getting defects . | | 1 |
| which institute is best for software testing in Hyderabad? | | 1 |
| what is opaque testing?,what is transparent testing | HP | 3 |
| Hi friends,
Could u pls tell the name of the institute who gives
realtime project(live project) in manual & automation
testing(qtp & load runner) in hyderabad & bangalore? | | 1 |
| I. Product feasibility
II. Software requirements
III. Software Design
IV. Acceptance test
Which of the above reviews are necessary in order to ensure
the traceability of requirements in the implemented
software?
1. I and II
2. I, II, and III
3. II and III
4. II, III, and IV
5. I, II, and IV
| | 1 |
| If the client identified some bugs to whom did he reported? | TCS | 1 |
| content of test status report | Convergys | 1 |
| |
| For more Testing AllOther Interview Questions Click Here |