ALLInterview.com :: Home Page KalAajKal.com
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
info       Did you received any Funny E-Mails from your Friends and like to share with rest of our friends? Yeah!! you can post that stuff   HERE
Google
 
Categories  >>  Software  >>  Testing  >>  Manual Testing
 
 


 

 
 Automation Testing interview questions  Automation Testing Interview Questions
 Manual Testing interview questions  Manual Testing Interview Questions
 QA Concepts interview questions  QA Concepts Interview Questions
 Mobile Testing interview questions  Mobile Testing Interview Questions
 Test Cases interview questions  Test Cases Interview Questions
 Test Documents Reporting interview questions  Test Documents Reporting Interview Questions
 Testing AllOther interview questions  Testing AllOther Interview Questions
Question
diff b/w waterfall model & spiral model?
 Question Submitted By :: Ramkrish_2009
I also faced this Question!!     Rank Answer Posted By  
 
  Re: diff b/w waterfall model & spiral model?
Answer
# 1
a)	When the customer or client requirements clear then 
that time use the waterfall model
g)	Spiracle model is nothing but version by version 
model
h)	The project have so many risks then
i)	Client requirements changes continuous then use 
this project


My name is k.chandra sekhar,
My phone no are 9246540049 65880049, Hyderabad.
My mail id is ndra_143@yahoo.co.in 
I am taking the class for projects and interview trips if 
you interest contact
 
Is This Answer Correct ?    9 Yes 4 No
K.chandra Sekhar
 
  Re: diff b/w waterfall model & spiral model?
Answer
# 2
- This is very simple model.  It moves like water fall from 
top to down of SDLC.  The drawback of this model is 
ineffectiveness of verification and validation activities.

Another name of water fall model:-Linear Sequential Model.
 
Is This Answer Correct ?    6 Yes 5 No
Ar.umesh
 
 
 
  Re: diff b/w waterfall model & spiral model?
Answer
# 3
The difference b/w Waterfall and Sprial Model are:
1) Risk factor is considered in the Spiral Model but in 
water fall Model it is not considered.
2)In waterfall the requirements are freezed but this not 
happens in the Spiral Model.
3)Water fall Model is linear sequential model where sprial 
model works in loop.
4) Spiral Model is costely as Risk factor is covered.
 
Is This Answer Correct ?    17 Yes 2 No
Simran
 
  Re: diff b/w waterfall model & spiral model?
Answer
# 4
the difference between waterfall and spiral model are:
1)waterfall model is simple and sequential,but spiral model
is complex.
2)waterfall works in sequential flow,but spiral works in loop.
3)In spiral model there is a better communication between
developer and customer,but in waterfall model the customer
should have patience.
 
Is This Answer Correct ?    14 Yes 1 No
Dharshini
 
  Re: diff b/w waterfall model & spiral model?
Answer
# 5
waterfall model is a rigid model and can easily be 
manageble but spiral model is not

waterfall model works well on smaller projects whereas 
spiral model woks on larger projects also

waterfall model is a iterative process whereas spiral model 
is a partitioned in four quadrants it is also called meta 
model.
 
Is This Answer Correct ?    4 Yes 0 No
Tejinder Singh
 
  Re: diff b/w waterfall model & spiral model?
Answer
# 6
Waterfall Model:
-Series of stages carried out in sequence
-Products of each stage subject to QA inspections
-Only if the products are acceptable is the stage signed off
and the next allowed to start
-Each new stage starts from an agreed baseline established
at preceding stage
-In reality stages will overlap
-No stage is repeated unless a radical change of project scope
-Waterfall may provide a good starting point for structuring
the project
-Can be useful for inexperienced practitioners
Easy to build a simple plan around

Spiral Model:

-When requirements are not well known in advance spiral
model may provide an alternative
-An iterative approach to developing a system
--High level requirement specification is drawn up
--Tested by building a prototype solution
--Prototype is reviewed and requirements are clarified or
changed and amended requirements specification is issued
-The cycle is repeated until requirements are stable and
users approve the deign
-At the beginning of the spiral the focus is on requirements
issues 
-At the end concentrates with technical issues 
-Iterations can spiral out of control if not tightly managed
--Each iteration will lead to requests for change
--Difficult to call a halt to the process resulting in
projects running late and over budget
-Scope can be difficult to manage
-Final solution can be inadequately documented and poorly
structured
--Prototypes can be viewed as tool for capturing
requirements eliminating design stage
-Can lead to false user expectations
-Early prototypes raise expectations that final solution is
imminent
 
Is This Answer Correct ?    0 Yes 0 No
Dariush
 

 
 
 
Other Manual Testing Interview Questions
 
  Question Asked @ Answers
 
Tell me about the best bug you ever found. Accenture1
2. The prime benefit of testing is that it results in improved defects a. True b. False  4
which testing is better equivalenc partitioning or bouandary value analysis and why? Hewitt4
On which basis u'll prepare the test cases. Semantic-Space6
how does a client /server environment affects testing? HCL3
what is mean by mr ? Intel6
What are your greatest weaknesses? Satyam2
Give an example of high severity and low priority bug?  2
difference between internet exploral and netscape navigator?  1
while reading specification documents if u got any doubts or u think the specification should be clear or when u think some changes should be there in specifcation docs, or u find the difference in FRS and Design docs,whom do u report this?? AOL3
I want Tracebility Matrix template, if any one have mail me at dada_khairnar@hotmail.com Ordain-Solutions2
what ways u followed for defect management  3
what is baseline in testing IBM4
What is Defect Leakage?What Gap Analysis? What are the functioanl requirements to test the Software? What is Latency bug? Yardi2
how to retrive only second row from table? CTS2
What is defect pooling?  5
hi iam keeping 2+ fake exp here is my project plz tell me wt kind of Q's can be posed on it. Blue room acts as the central repository for all project information – providing detailed view into the operations of entire services of the organization. Blue room provides access to different levels of users based on their role like CEO, client, project managers, project leader and team members. Each will have permissions to access different functionality of the tool. Blue room gives access to higher management like CEO, VP or Project managers to real-time data including project completion percentages, gross margin, remaining engagement time, budget vs. actual, and profitability analysis. Through this extensive visibility, services professionals gain a better understanding of the overall performance of their services organization and are able to make faster and more effective strategic business decisions. Upload and download your Project files into Blue room from anywhere, making the latest project plans available to all participants via the Internet. n 1 more project also: Cable Network Management System (CNMS) efficiently handles customer information, billing and also effectively monitors the services provided. CNMS mainly consists of two modules. Cable Network Information (CNI) and Customer Accounts (CA). CNI maintains customer's information, employee information, service areas and tariff. CA is completely an accounting package, which helps to handle all accounting transactions of the company. The CA module is an important module and it includes account type, login information, and payment methods etc. Each customer account is linked in the system with a specific services offered to a customer, and the customer will be billed depends on his usage of these services. Customer account belongs to specific account type, which is related to some price plans and discounts. The billing process involves receiving billing records from various networks, determining the billing tariff associated with the area, calculating the bill for each customer on monthly basis, aggregating these records periodically to generate customer bills, sending bills to the customer, and collecting payments received from the customer and adjust customers balances accordingly. Up to Date Balance sheet, Import and Export feature, Network Compatible and user friendly, Rescue data through Recovery system and Dynamic Report Generation are other important features. can any 1 plz tell wt kind of test cases will be asked on dis.  3
What are the concepts of networking and database ,a software tester should know?  1
I am having 1.6 yrs. of total experience in Software Testing.I have interview call from a company. Tell me which questions are basically ask to experienced persons.  1
what is meant meant by test log? Mastek1
 
For more Manual Testing Interview Questions Click Here 
 
 
 
 
 
   
Copyright Policy  |  Terms of Service  |  Help  |  Site Map 1  |  Articles  |  Site Map  |   Site Map  |  Contact Us interview questions urls   External Links 
   
Copyright © 2007  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  Forum9.com   ::  KalAajKal.com