ALLInterview.com :: Home Page KalAajKal.com
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
tip   SiteMap shows list of All Categories in this site.
Google
 
Categories  >>  Software  >>  Testing  >>  Testing AllOther
 
 


 

 
 Automation Testing interview questions  Automation Testing Interview Questions
 Manual Testing interview questions  Manual Testing Interview Questions
 QA Concepts interview questions  QA Concepts Interview Questions
 Mobile Testing interview questions  Mobile Testing Interview Questions
 Test Cases interview questions  Test Cases Interview Questions
 Test Documents Reporting interview questions  Test Documents Reporting Interview Questions
 Testing AllOther interview questions  Testing AllOther Interview Questions
Question
In "V" model of SDLC which phase correspond to integration 
testing:
1. Requirements
2. Analysis
3. Design
4. Coding
 Question Submitted By :: Sunil Kumar
I also faced this Question!!     Rank Answer Posted By  
 
  Re: In "V" model of SDLC which phase correspond to integration testing: 1. Requirements 2. Analysis 3. Design 4. Coding
Answer
# 1
In "V" model of SDLC Correspond to integration testing will
be  design.
 
Is This Answer Correct ?    0 Yes 1 No
Pratap
 
  Re: In "V" model of SDLC which phase correspond to integration testing: 1. Requirements 2. Analysis 3. Design 4. Coding
Answer
# 2
The design phase corresponds to the integration testing as 
this is the phase where different modules / sub systems of 
a system are defined. After this phase only the integration 
test scenarios / cases can be written.
 
Is This Answer Correct ?    2 Yes 0 No
Meetu Mahajan
 
 
 
  Re: In "V" model of SDLC which phase correspond to integration testing: 1. Requirements 2. Analysis 3. Design 4. Coding
Answer
# 3
In the V Model hte integration testing corresponds to the 
design phase. As this is the phase where the high level 
design and functionality of the application will be 
determined before coding them. At the coding level, unit 
testing would be done and then when coding is complete it 
and unit testing is over, the integration testing would be 
done. The integration test cases would derive their input 
from the design specifications document.
 
Is This Answer Correct ?    2 Yes 0 No
Ella
 

 
 
 
Other Testing AllOther Interview Questions
 
  Question Asked @ Answers
 
what is about back end testing? HCL4
WHAT ARE THE BUG TRACKING TOOLS USED IN TESTING PROCESS AND WHICH IS BETTER TOOL TO BE USED IN BUG REPORTING ?  1
I’ve been using a test tool for quite some time but it has not lived up to the expectations. So I’m planning to invest in a good one. Please suggest some?  1
Please understand me.....will there be any age criteria in software - testing? now i am 37.i have completed Msc (elec).i got experience in marketing,one year in call center.can i try for s/w testing? please suggest.i am very mech interested in testing and i have good knowledge in testing also.....please suggest  1
What are the Roles of Team Lead ? HCL2
may i know the sites which r giving model question papers for istqb exam  2
Actually how many positive and negetive testcases will write for a module? Accenture3
What is Test Server? TCS1
What is the difference between Code Release and Code Build? L&T1
what is control sheet? IBM1
what is the difference in between defect age and build interval period?  1
Your company is about to evaluate its own performance. What type of audit is it conducting? 1. First-party 2. Second-party 3. Third-party 4. Intrinsic 5. Extrinsic  1
I got job in maveric a testing company. there is 3 years bond. and they are taking all original certificates. I am unable to decide whether to join or not. please let me know whether it is a good company or not. its website is www.maveric-systems.com  1
What is mean by release notes? TCS1
Could anybody tell me types of testing involved when the project is at maintenance. Oracle2
how to test Browswer Compatability Testing ?  2
What process model u r using 4 current project. (Eg: Water fall model, prototype model etc) and why?  1
What is test plan and explain its contents? TCS1
What is bottlenecks? Explain with example.  1
What is the point of reference by which something can be measured? 1. Benchmark 2. Baseline 3. Metric 4. Measure 5. Indicator  3
 
For more Testing AllOther Interview Questions Click Here 
 
 
 
 
 
   
Copyright Policy  |  Terms of Service  |  Help  |  Site Map 1  |  Articles  |  Site Map  |   Site Map  |  Contact Us interview questions urls   External Links 
   
Copyright © 2007  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  Forum9.com   ::  KalAajKal.com