ALLInterview.com :: Home Page KalAajKal.com
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Do you have a collection of Interview Questions and interested to share with us!!
Please send that collection to along with your userid / name. ThanQ
Google
 
Categories  >>  Software  >>  Testing  >>  Testing AllOther
 
 


 

 
 Automation Testing interview questions  Automation Testing Interview Questions
 Manual Testing interview questions  Manual Testing Interview Questions
 QA Concepts interview questions  QA Concepts Interview Questions
 Mobile Testing interview questions  Mobile Testing Interview Questions
 Test Cases interview questions  Test Cases Interview Questions
 Test Documents Reporting interview questions  Test Documents Reporting Interview Questions
 Testing AllOther interview questions  Testing AllOther Interview Questions
Question
In "V" model of SDLC which phase correspond to integration 
testing:
1. Requirements
2. Analysis
3. Design
4. Coding
 Question Submitted By :: Sunil Kumar
I also faced this Question!!     Rank Answer Posted By  
 
  Re: In "V" model of SDLC which phase correspond to integration testing: 1. Requirements 2. Analysis 3. Design 4. Coding
Answer
# 1
In "V" model of SDLC Correspond to integration testing will
be  design.
 
Is This Answer Correct ?    0 Yes 1 No
Pratap
 
  Re: In "V" model of SDLC which phase correspond to integration testing: 1. Requirements 2. Analysis 3. Design 4. Coding
Answer
# 2
The design phase corresponds to the integration testing as 
this is the phase where different modules / sub systems of 
a system are defined. After this phase only the integration 
test scenarios / cases can be written.
 
Is This Answer Correct ?    2 Yes 0 No
Meetu Mahajan
 
 
 
  Re: In "V" model of SDLC which phase correspond to integration testing: 1. Requirements 2. Analysis 3. Design 4. Coding
Answer
# 3
In the V Model hte integration testing corresponds to the 
design phase. As this is the phase where the high level 
design and functionality of the application will be 
determined before coding them. At the coding level, unit 
testing would be done and then when coding is complete it 
and unit testing is over, the integration testing would be 
done. The integration test cases would derive their input 
from the design specifications document.
 
Is This Answer Correct ?    2 Yes 0 No
Ella
 

 
 
 
Other Testing AllOther Interview Questions
 
  Question Asked @ Answers
 
Which is the good tool for testing between Load Runner or Win Runner,and which version.Can u plz tell me on my id i.e nitin9360@gmail.com,thnks.  2
Is there any test tool that tracks live metrics? Can anyone help me?  1
What is the minimum criteria for white box? TCS1
What are the technical reviews? TCS1
Actually how many positive and negetive testcases will write for a module? TCS1
How can you test an application after production and deployed in to the clients system, connecting to the (Client's)server which is located somewhere in the US. I mean how can you connect and test when it is at maintenance Oracle1
I’ve been using a test tool for quite some time but it has not lived up to the expectations. So I’m planning to invest in a good one. Please suggest some?  1
Your company is about to evaluate its own performance. What type of audit is it conducting? 1. First-party 2. Second-party 3. Third-party 4. Intrinsic 5. Extrinsic  1
In what basis you will write test cases? TCS1
who does the security check on the web site, other than login/password screens ?  1
what is sdlc(Software development proces and stages of sdlc)..?  2
How to copy some tables in a DB to another DB in SQL Server CybAge1
What is Test Server?  1
Can anyone tell me is there any cirtification in Testing like we have SUN cirtification in java,if yes then from where i can get it & which institute offer those cirtification & what is he process  3
Explain Quality centre? how companies follow the process?  1
what is the exact difference between a product and a project.give an example Wipro3
what are the main bugs which were identified by you and in that how many are considered as real bugs? Accenture1
Usually customers won't give all the requirements. How will u manage & collect all the necessary information.  3
If your current project is US based project, where will your Business Analyst stay ? India or US ?? ADP3
What are the Roles of Team Lead ? HCL2
 
For more Testing AllOther Interview Questions Click Here 
 
 
 
 
 
   
Copyright Policy  |  Terms of Service  |  Help  |  Site Map 1  |  Articles  |  Site Map  |   Site Map  |  Contact Us interview questions urls   External Links 
   
Copyright © 2007  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  Forum9.com   ::  KalAajKal.com