I suppose you cant maintain the same material master for
two different company codes. I beleive you should have two
different master records for the same material across two
different co. codes. Pls correct me if im wrong.
i think we can move the goods from one company code to
another,with the help of cross company sales.
iam also not so correct about this,please correct this.
I agree with the above answer.. but for cross company sales
after making all the required customisation, you asign the
material to the sales organisation of a different co.code
other than that of the original plant's co.code. but u donot
maintain the material for two diferent co. codes as such..
pls correct me if im wrong..
.
there is no need to maintain one material for different co.
code just defined plant for cross system goods flow becouse
material is mainly related to plant and we create it at
plant and sales area level
Pls correct me if i m wrong
In addition to Yogesh's reply, Yes. You can extend the
material to the other plant.
In MM01, you have the option to copy the material info from
one plant to the other ,Provide the plant name of the other
company in the plant name field .thereby you maintain the
material info for 2 diff company(plant).
Please correct if this is wrong
Yes, I agree with Sidh, You can extend material to the
other plant in mm01, you can copy the plant and and storage
location from where you want to copy apart from that you
have to assign plant to sales org, distribution channel in
enterprise structure. so that you will not face any problem
while creating customer master record (XD01). You need to
assign Plant to company code in enterprise structure.
It is not necessary to maintain a material fro 2 diff
company codes.
What we can do is maintain the material for 2 plants, in
the 2 company codes in which you wanted the material to be
maintained.
Just go to MM01, enter the material, then in the selection
fields select all, then enter the required plant, sales
area, SLOC, that will be it.
Just remember to fill the Accounting Views (both 1 and 2)
data in case they are not copied from the previous plant
(if they are different).
Enter a few of the mandatory fields that the system will
prompt, like Availability check and loading group etc.
And you will be through.
But, in this case if the materils is active for GTS (Global
Trade services), you may expect a GTS block while working
with the material in the new plant. Since if the material
is extended to a new plant then it needs a new license for
it.
Other than that I feel that this will work pretty well.
Hi guys,
I am new to sap sd , I am facing the problems when creating
customer A/c with t code xd01,
1. i was created ac group,number ranges and assigned ac
groups to no ranges.it is working ok .
2. i did the partener determination procedure but it is not
working can u give clear view of it.
3. when i was trying to create customer system showing
partner functions in different language , where can i set
language.
4. my main question is when we join the org we are going to
do the configu job or what would be our role in sd , ( like
we are going to create SO, delivery doc, invoices or
anything else) Please guys provide me the clear picture on
it bcas i am very confused ( every thing is given by the
sap what we are going to do in that )
advance thanks to every body, i am eagerly waiting for your
answers.
In intra company stock transport order, there will be no
billing document. What enhancements can you think of if
Client wants to see the amount of goods transported from
Plant A to Plant B.
How can you find out in Customer Master weather a customer
is a ship- to or a bill-to? How is this information stored
in SAP? Please mention the transactions/tables you would
use.