ALLInterview.com :: Home Page KalAajKal.com
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
tip   SiteMap shows list of All Categories in this site.
Google
 
Categories  >>  Software  >>  Testing  >>  Automation Testing  >>  QTP
 
 


 

 
 WinRunner interview questions  WinRunner Interview Questions
 Load Runner interview questions  Load Runner Interview Questions
 QTP interview questions  QTP Interview Questions
 Test Director interview questions  Test Director Interview Questions
 Rational TestSuite interview questions  Rational TestSuite Interview Questions
 Silk Test interview questions  Silk Test Interview Questions
 Automation Testing AllOther interview questions  Automation Testing AllOther Interview Questions
Question
When should u feel that u can stop testing now?

The following are few of the common Test Stop criteria:
 Question Submitted By :: Sreeprasad
I also faced this Question!!     Rank Answer Posted By  
 
  Re: When should u feel that u can stop testing now? The following are few of the common Test Stop criteria:
Answer
# 1
- All the high priority bugs are fixed.

- The rate at which bugs are found is too small.

- The testing budget is exhausted.

- The project duration is completed.

- The risk in the project is under acceptable limit.

Practically, the decision of stopping testing is based on

the level of the risk acceptable to the management. As

testing is a never ending process, we can never assume that

100 % testing has been done, we can only minimize the risk

of shipping the product to client with testing done.
 
Is This Answer Correct ?    2 Yes 0 No
Sreeprasad
 
  Re: When should u feel that u can stop testing now? The following are few of the common Test Stop criteria:
Answer
# 2
Testing can be stopped when 
The bug rate is comparatively less to the acceptable limits.
All de test cases for tat particular functionality is passed.
Client  urgency
Testing budget insufficient.
Lack of time for the testing process.
 
Is This Answer Correct ?    0 Yes 0 No
Priya
 
 
 

 
 
 
Other QTP Interview Questions
 
  Question Asked @ Answers
 
How to make an Action as reusable?  1
what is database check point, how will you parameterize the database from seperate data table? JPMorgan-Chase2
waht is puirpose of accesbility Check point? waht is the use of Page and XML check points?  1
Hai Guys, can anybody show me how to write automaed test cases using VB scprit(examples)...i had an interviw soon...please guyz send as quickly as possible  5
What is the Diff between Image check-point and Bit map Check point? Ordain-Solutions3
Once the Actions are splitted , is there any way to merge them  3
Hi All, What is an XML Checkpoint in QTP? How can i use it while testing a web application? Kindly explain in detail. Thanks in advance  2
What is QTP Frame Work ,and i want it in detail Value-Labs1
How can we redirect QTP results in to a excel sheet after the execution Virtusa2
Hi all. Could anyone tell me the difference between an Action and a Function in QTP. Thanks in advance and Merry Christmas. IBM3
What is test harness?  2
you written some code in qtp for opening google.com browser and entered some text inthe search text box and clicked search button. this is ur script.. before running this script i have already opened two google.com browsers. now am running the script what will happen? script will run or what?? Thanks... Nani Oracle4
How can we export test results to an excel sheet in QTP??? Can any one provide sample coding for this????? TCS4
what is Compile Module in QTP? what exactly it contains Functions or Actions?  1
Hi, When I click on a hyperlink a secondary pop-window will open. In that pop-up window there will be 'N' number of records arranged in with paging option in datagrid table. Each rows contains two columns, one is text and the other is a radio button. I will pass the first column value and based in it the tool have to select the corresponding radio button in that row. Please someone help me how to handle this as am new to QTP. CTS1
HOW TO DO THE BATCH TESTING USING QTP? Ordain-Solutions2
Why we are selecting QTP for testing ? HP17
How can i Save the snapshots in a specified folders using Scripting in QTP?  1
can some one help me how to compare the values from one sheet to values in another sheet? suposse i have a feild called Temp in action1 and i also have temp in action2. i want to compare the values of those two actions sheets data table? how can i do it using descriptive programming?  1
how to pass parameters from one action to another using output parameters I am not calling action 2 from action 1, they are being called individually I need syntax please .. Requirement: Action 1 customer = Browser(" ").Page(" ").Link(" ").GetROProperty("value") I want to use the value stored in customer in Action 2 I do not want to use any of these actions as re-usable actions  2
 
For more QTP Interview Questions Click Here 
 
 
 
 
 
   
Copyright Policy  |  Terms of Service  |  Help  |  Site Map 1  |  Articles  |  Site Map  |   Site Map  |  Contact Us interview questions urls   External Links 
   
Copyright © 2007  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  Forum9.com   ::  KalAajKal.com