ALLInterview.com :: Home Page KalAajKal.com
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
tip       Ask Questions on ANYTHING, that arise in your Daily Life at     FORUM9.COM
Google
 
Categories  >>  Software  >>  Testing  >>  Manual Testing
 
 


 

 
 Automation Testing interview questions  Automation Testing Interview Questions
 Manual Testing interview questions  Manual Testing Interview Questions
 QA Concepts interview questions  QA Concepts Interview Questions
 Mobile Testing interview questions  Mobile Testing Interview Questions
 Test Cases interview questions  Test Cases Interview Questions
 Test Documents Reporting interview questions  Test Documents Reporting Interview Questions
 Testing AllOther interview questions  Testing AllOther Interview Questions
Question
How do you develop a test plan and schedule? Describe
bottom-up and top-down approaches.
 Question Submitted By :: Arthi Rao
I also faced this Question!!     Rank Answer Posted By  
 
  Re: How do you develop a test plan and schedule? Describe bottom-up and top-down approaches.
Answer
# 1
we are not going to develop test plan document. test lead is
going to prepare test plan documents.bottom up and top down
approaches are used for integration testing.in top down
approach we are connecting main module with submodules in
the place of remaining under constructive sub modules we
will use stubs. in bottom up approach in the place of under
constructive main module we will use a temporary program
call ed driver

k friends
subhan.k
 
Is This Answer Correct ?    1 Yes 0 No
Subhan.qa
 
  Re: How do you develop a test plan and schedule? Describe bottom-up and top-down approaches.
Answer
# 2
the Test lead is preparing the test plan document and he is
scheduling that means how to test, what to test, who to test
and when to test.
BOTTOM-UP approach is, in this the main module will be under
construction, to conect the main module with submodule we
use a temperory programme called Drivers in the place of
Main module.
TOP-DOWN, in this approach the sub modules will be under
construction to connect this main module to sub modules we
use  temperory submodule called Stubs.
By using temperory programmes called Stubs(sub-module),
Drivers(main module) we connect the programmes.
 
Is This Answer Correct ?    0 Yes 1 No
Neelavathy
 
 
 
  Re: How do you develop a test plan and schedule? Describe bottom-up and top-down approaches.
Answer
# 3
Normally Test lead is preparing Test plan document but team
member May be involved in preparing Test plan document. 
This is the information given in the ISTQB Material.

WBS-Work Break down Structure is used to do scheduling which
holds the following information.

1. what to test, 
2. who to test
3. when to test.
By using WBS we can analyze whether we are going in the
right path or varying from the plan.
 
Is This Answer Correct ?    0 Yes 1 No
Prabhu
 
  Re: How do you develop a test plan and schedule? Describe bottom-up and top-down approaches.
Answer
# 4
Test plan & schedule is prepared from following:

1. Historical data
2. If some similar project is currently under testing
3. SRS doc
4. Functional Specification Doc
 
Is This Answer Correct ?    0 Yes 0 No
Jim
 

 
 
 
Other Manual Testing Interview Questions
 
  Question Asked @ Answers
 
what exactly meaning of Defect Differed ?? TCS6
What test cases should be written in performance testing manually?  1
what are the risk factors in the project? what is the base for testplan and entry criteria ,exit criteria for test plan?  1
write four steps for writting scenario ?  3
Is there any difference between Web Application and Client - Server application? If yes pls explain it.  1
At what stage, the application can undergo performance testing?  1
what is gap analysis QA2
How many Test-Cases can be written for the calculator having 0-9 buttons,Add,Equalto buttons.The testcases should be focussed only on add-functionality but mot GUI.What are those test-cases? Mphasis3
how we receive the build ? will there be change in version for every single bug the developer fixes ?  2
What is the Difference between Client Server and a web Application? CTS6
if i give some thousand tests to execute in 2 days what do u do? BirlaSoft20
what is the difference between TEST PLAN,TEST STRATEGY,TEST SCENARIO,TEST SUMMARY  1
Can u test a website or a webapplication manually without using any automation tool? IBM3
What r test closure documents?  1
Is it necessary to test application in lower versions of OS when you have tested in latest version TCS4
how u will write test case for system testing give me example  2
can we directly write test cases in test directory. Covansys2
what is the difference between stress and load testing  5
what is the difference between application server and web server? Symphony3
what is impact analysis QA2
 
For more Manual Testing Interview Questions Click Here 
 
 
 
 
 
   
Copyright Policy  |  Terms of Service  |  Help  |  Site Map 1  |  Articles  |  Site Map  |   Site Map  |  Contact Us interview questions urls   External Links 
   
Copyright © 2007  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  Forum9.com   ::  KalAajKal.com