what is Pre- commissioning.

Answers were Sorted based on User's Feedback



what is Pre- commissioning...

Answer / mahesh

Before start up a plant need to cheek instrument range, connection, parameter, soars. different cheeking only help of p&id.

Is This Answer Correct ?    2 Yes 0 No

what is Pre- commissioning...

Answer / raja2016

In addition to above ans w. r.t an instrument...

w.r.t to a system consists of PLC panel
Earthing should be done properly and proper earth resistance value...
Electronic earthing and body earthing..

UPS supply availability, all the cables.,
PLC-MCC
PLC- field
ensuring laid,terminated and loop checked okay...

PLC- SCADA PCs all Ethernet cables laid and terminated as per system architecture...

Is This Answer Correct ?    1 Yes 0 No

what is Pre- commissioning...

Answer / s93381

before the plant startup check all system instrument parameter that is Pre- commissioning.

Is This Answer Correct ?    0 Yes 0 No

what is Pre- commissioning...

Answer / faiyaz

before start up the plant we check all the instrument and parameter with the water in process line that is called pre commissioning

Is This Answer Correct ?    0 Yes 0 No

what is Pre- commissioning...

Answer / faiyaz

pre commissioning is the process of providing the ability of a pipe line and piping system to contain product without leaking

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Instrumentation Interview Questions

What is difference between ESD and PLC please Explain me clearly.

0 Answers  


model question paper of instrumentation for Jindal GET 2010.plz reply sudhanshukumar08@yahoo.com

0 Answers   Jindal,


how to tune the closed pid loop?

3 Answers  


How does electro magnetic pump works ?

1 Answers   IGCAR,


How to get Cv of control valve having following parameter ,i.e inlet pressure 4.5kg/cm2 outlet pressure 1 kg/cm2 specific gravity 0.808

3 Answers  






what is the standard controll pressure

1 Answers  


How to calibrate capillary type level transmitter

0 Answers  


Is there any interfacing sofware to build communication between a PC and ER300P model L&T make trivector meter via RS485 port which is available in the meter and is there any data acquisition card available to store the acquired data from the meter into the system

12 Answers  


why gray colour is choosing to all instrument panel.why not choosing other colour?

1 Answers   Reliance,


what is the basic working principle of I/P and Positioner in any control valve.

12 Answers   Essar, Visa Steel,


Working principle of magnetic flow meter ......and calibration procedure of e+h magnetic flowmeter...

0 Answers  


WHAT PRINCIPLE OF GAS ANALYSER( CO,CO2,N2)

2 Answers   Jubilant Organosys,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5084)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16631)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1094)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)