Civil engineering related
No Answer is Posted For this Question
Be the First to Post Answer
Slump Values for works?
0 Answers Aditya Constructions, SVS Constructions,
how can calculate material in 1:1.5:3 ratio in concrete
where lap is provided in colom?
How much steel required for only ground floor of 1600 Sq foot.Having general structure ?
how to find the quantity of materials required for constructing a wall of length 10*5*.2m?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
for pretensioning which will yield first and same for post tensioning?
how to calculate cement coefficient for 20mm thick vitrified tiles flooring with cm 1:4 with explaination
What is the tallest man made structure in the world?
what is the breaking strength of wall tiles
which is greater moment at centre or fixed end moment for a fixed beam with udl
What is water/cement ratio? Importance in construction?