how to take the quantity of block work and plastering
1block price:3saudi riyal
cement:1bag:15 saudi riyal
sand:3bag:20 saudi riyal
1mason:9hour per hour 40 saudi riyal
1labour:9hour per hour 40 saudi riyal
can anybdy calculate
No Answer is Posted For this Question
Be the First to Post Answer
what is levelling staff least count
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
what is the maximum number of course that can be laid according to IS code and the max height.
What is civgl engg?
how many square meter plastering get from 1 cubic meter cement mortar for a thickness of 12mm
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
How do we say The LAP LENGHT is 50D to 60D ?????
what is the difference between natural draught cooling tower and induced draught cooling tower
600 brass equal to how many cubic meter..
What is the likely strength of a 1:2:4 concrete mix?
In case of a beam ,main steel is provided along the longer span because, bending moment is directly proportional to length but why in case of one way slab main steel is provided along shorter span while as bending takes place along longer span?comment