ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3073)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3287)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13323)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2364)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (416)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (79)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (163)
 Instrumentation interview questions  Instrumentation Interview Questions (2375)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (106)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (43)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (75)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1196)
Question
i need the how much materials are needed for cubic feet of 
concrete?
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
FOR PROPORTION 1:2:4 FOR 1CU-MT WORK OF CONCRETE CEMENT REQUIRED AS FOLLOWS
CEMENT ---6.5 BAGS
SAND ----0.434 CU-MT
KANKAR --0868 CU-MT
 
Is This Answer Correct ?    1 Yes 0 No
Guest
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
what is mix design?   1
material calculations for I st coatplastering 16mm CM (1:5),second coat CM(1;3)4mm thick,pcc(1:4:8),RCC M20,lime stone masonry CM(1:6)   1
How to calculate the rating of airconditioner required in any area,how to calculate the cfm required for any exhaust unit or air washer unit. John-Crane 5
What are the tests to be conducted on cement? RRB 3
Can a 9" x 24" RCC beam be supported on 18" x 18" RCC beam. ASD-Lab 1
what is the wight of 4"/6" solid block?   2
among the strectcher, header, english and flemish bond which has greater strength? where these bonds are preferred?????   2
what is the yield strength of M30 grade of concrete   1
1) One mason per day how many cu.m work will do as per list given a) Brick work,hollow brick work and cc block work and plastering how many m2 per day 2) one carpenter per day how many m2 will do as well as scaffolding how many m3 NCC 2
what is the theoritical percentage of concrete cubes testing per day?   1
how many lab test on bricks and aggregate write briefly please omaxe 1
What is softsoil? what kind of foundation?   7
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com