ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3149)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3304)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13474)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2393)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (423)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (166)
 Instrumentation interview questions  Instrumentation Interview Questions (2407)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (107)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (45)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (81)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1205)
Question
i need the how much materials are needed for cubic feet of 
concrete?
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
FOR PROPORTION 1:2:4 FOR 1CU-MT WORK OF CONCRETE CEMENT REQUIRED AS FOLLOWS
CEMENT ---6.5 BAGS
SAND ----0.434 CU-MT
KANKAR --0868 CU-MT
 
Is This Answer Correct ?    2 Yes 0 No
Guest
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
m20 grate concret mix,if sand&agregate take by wights for 1 bag cement so how much any formula?   2
the building construction what type of equipments are used in site and its purpose?   1
what"s the responsibilities for QC(quality controler)in high rise buildings? Ashok-Leyland 3
WHAT HAPPEN WHEN USING OF LARGEST POSSIBLE MAXIMUM SIZE AGGREGATE RATHER THAN SMALLER AGGREGATE IN RCC ?   3
Cube tests of concrete are failed at 7 days and 28 days.What is your next action? Parsvnath 8
What is the difference between Autodesk revit structure and STAAD pro.? How much it is useful to structural engineer in modelling, analysis & design of RCC and Structural steel structures than STAAD pro.? L&T 2
What is the ratio of materials used for M10, M15, M20 & M25 grades of concrete? Also specify the quantity of water used in each grade & how to calculate it? Avs 4
who much should be the lap length in reinfocement L&T 20
when we select buildup beam   1
1 liter emulsion paint covered how much area? DEWA 7
difference between ordinary portland cement concrete strength and pozzolona portland cement concrete strenth NCC 5
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.   1
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com