| Other Civil Engineering Interview Questions |
| |
| Question |
Asked @ |
Answers |
| |
| Though Column is a compression member and concrete takes
compression, why we use steel at column ? |
| 3 |
| What is ideal location for cube casting, RMC vehical at
Ground Floor and Slab casting at 40th Floor |
| 7 |
| 24. Why should we hire you? |
| 1 |
| What is the difference between stress and strength? |
| 12 |
| what is the purpose of laying PCC? |
| 13 |
| how much cement is required for 100 sft plastering of ratio
1:4 |
| 5 |
| which concrete grade has highest strenth and what is its
comosition? |
| 10 |
| what is concrete |
| 9 |
| what is the difference between built-up area & carpet area?
how to calculate this areas?as there are any formula to
calculate these areas? |
| 5 |
| How many no of bricks form 1 cum?
How many no of solid blocks form 1 cum? |
| 2 |
| what is the silt(for sand) allowed persentage as per IS
CODE
B/W:
PLASTER:
CONCRETE : |
| 4 |
| what is the method of all soil testing in lab? |
| 2 |
| |
| For more Civil Engineering Interview Questions Click Here |