ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3077)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3289)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13333)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2363)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (416)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (79)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (163)
 Instrumentation interview questions  Instrumentation Interview Questions (2381)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (106)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (44)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (77)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1196)
Question
1 Cum  Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
Volume of 1 Brick = 0.230*0.115*0.075 = 0.002
So No of brick req for 1 m3 = (1/0.002) = 500 Nos

1.7 bag of Cement required

0.31 cum sand required for 1 cum of brickwork
 
Is This Answer Correct ?    60 Yes 12 No
Hussain
 
Answer
# 2
brick size in meter=.23*.115*.075 =.0019
add 10 mm mortar for ech sides=(.24*.125*.085)=(.0025)

bricks required for 1 m3 =(1/(0.0025)=400 nos

mortar required =(.0025-.0019)*400=.24

add 15% for wastage = (.24*1.15)=.276m3

so required sand is =.276 m3

cement is =(1440/6)=240*.276= 66 kg
 
Is This Answer Correct ?    22 Yes 12 No
Raja J
 
 
 
Answer
# 3
500 bricks, 
Is This Answer Correct ?    2 Yes 0 No
Guest
 
Answer
# 4
Sorry For above Answer

By Analysis of Rate-2007

#Bricks of class designation 7.5 in foundation and plinth
in :-
Brick with wastage = 494
Mortar = .25
Cement Ratio is 1:6, then
Cement=(.25/(1+6))*1 = .0357 cum
Cement in Bags = .0357/.034722 = 1.0286 bags

Sand = (.25/(1+6))*6 = 0.2143 cum
= 0.2143 * 35.29 = 7.56 Cft
# Bricks of class designation 7.5 in superstructure above
plinth level up to floor V level in all shapes and sizes
in:-
Brick with wastage = 494
Mortar = .22
Cement Ratio is 1:6, then
Cement=(.22/(1+6))*1 = .03143 cum
Cement in Bags = .03143/.034722 = 0.905 bags

Sand = (.22/(1+6))*6 = 0.189cum
= 0.189* 35.29 = 6.655 Cft
 
Is This Answer Correct ?    9 Yes 8 No
Md Gyasuddin Ahsan
 
Answer
# 5
Bricks :395
Cement:1.25 Bags (CPWD)
C-sand:10 cft
 
Is This Answer Correct ?    4 Yes 3 No
Md.furqan Anasri
 
Answer
# 6
Exp:-length of wall=10ft
Bredth of wall=4.5in
Height of wall=9.5ft
Qty.10*0.375*9.5=35.625cft
Provide .5in morter in each line of bricks.
So,first calculate qty.of mortar in total work with following steps:-
Step-1. Calcuate qty. of mortar in one line
of bricks:-
10*0.375*0.0625=0.2344cft.
Step-2. Calculate nos. of lines of bricks in given height:-
9.5/0.292=32.53 or 33bricks.
Step-3. Calculate qty. of mortar:-
33*0.2344=7.73cft.
So,Total brick work:-
35.625-7.73=27.895cft
Net. Qty. of bricks=
27.895/0.0703=396.8bricks
say 397 bricks
 
Is This Answer Correct ?    1 Yes 0 No
Er.harjinder Singh
 
Answer
# 7
By Analysis of Rate-2007

#Bricks of class designation 7.5 in foundation and plinth
in :-
Brick with wastage = 494
Mortar = .25
Cement Ratio is 1:6, then
Cement=(.25/(1+6))*1 = .0357 cum
Cement in Bags = .0357/.034722 = 1.0286 bags

Sand = (.25/(1+6))*6 = 0.2143 cum
= 0.2143 * 35.29 = 7.56 Cft
# Bricks of class designation 7.5 in superstructure above
plinth level up to floor V level in all shapes and sizes
in:-
Brick with wastage = 494
Mortar = .22
Cement Ratio is 1:6, then
Cement=(.22/(1+6))*1 = .03143 cum
Cement in Bags = .03143/.034722 = 0.905 bags

Sand = (.22/(1+6))*6 = 0.189cum
= 0.189* 35.29 = 6.655 Cft
 
Is This Answer Correct ?    0 Yes 0 No
Shahvez
 
Answer
# 8
540 bricks
1.40 cement
0.30 cu sand
 
Is This Answer Correct ?    1 Yes 1 No
Fezan Butt
 
Answer
# 9
bricks 500
cement 1.54 bags
sand .32 m^3
for C:S 1:6 brick work
 
Is This Answer Correct ?    0 Yes 0 No
Rizwan Akbar
 
Answer
# 10
cement = 1.40 Bags
sand = 10.50 Cft
Bricks = 466 Nos
 
Is This Answer Correct ?    0 Yes 1 No
Asmar Ahmed
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
what is tacheometry? NBCC 2
what is a minimum strength recommented for aerocon blocks?   1
Whr should a joint be located in a beam if the provision of a joint is unavoidable?? BMTC 2
To construct 100sq.yard what will be the cost in detail pls   2
by which IS Code bend correction is two times of the dia meter of steel is taken   3
size of the traditional brick is 248*121*71 in mm,but why the size are like this.why the size are not like that 211*154*75 in mm Merlion 1
how to find out the quantity of cement sand and aggregate in slab and flooring L&T 1
point of contraflaxure   1
how much minimum steel provide in column   3
what is difference in chemical composition between fe415 and fe500   1
Kindly furnish the relation between 7 days strength & 28 days compressive strength of Cement Concrete cubes. Can you clarify whether the relation gets altered due to WATER- CEMENT ratio?   1
what is the max spacing of 2 columns upto which there is no need to put beam betwn dem.and how to fix the location of columns and beams in home construction.   2
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com