ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3015)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3272)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13227)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2349)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (407)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (16)
 Metallurgy interview questions  Metallurgy Interview Questions (79)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (162)
 Instrumentation interview questions  Instrumentation Interview Questions (2319)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (104)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (43)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (73)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1190)
Question
1 Cum  Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"
 Question Submitted By :: Jai
I also faced this Question!!     Rank Answer Posted By  
 
  Re: 1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3"
Answer
# 1
28 Brick,5 kg,20 kg 
Is This Answer Correct ?    27 Yes 74 No
Omender Sirohi
 
  Re: 1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3"
Answer
# 2
500 bircks,58bags of cement,0.24cum of sand 
Is This Answer Correct ?    25 Yes 62 No
V,anusha
 
 
 
  Re: 1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3"
Answer
# 3
Volume of 1 Brick = 0.230*0.115*0.075 = 0.002
So No of brick req for 1 m3 = (1/0.002) = 500 Nos

1.7 bag of Cement required

0.31 cum sand required for 1 cum of brickwork
 
Is This Answer Correct ?    42 Yes 11 No
Hussain
 
  Re: 1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3"
Answer
# 4
395 bricks
53 kg cement
08 cft sand
 
Is This Answer Correct ?    8 Yes 23 No
Aravinh
 
  Re: 1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3"
Answer
# 5
Bricks- 417 nos
Cement- 53 kg
Sand - 0.3 cum

mortor thickness deducted to be done.

u want to know how it comes????
 
Is This Answer Correct ?    8 Yes 16 No
Syed Muhsin.s
 
  Re: 1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3"
Answer
# 6
Bricks- 460Nos
Sand- .29 cum
Cement- 1.7 begs
 
Is This Answer Correct ?    5 Yes 16 No
Ashish Jain
 
  Re: 1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3"
Answer
# 7
1M=39.37Inch.
1Cum =61023.37
no of bricks =61023.37/9*4.5*3 =502.25 or 503nos
for mortar 3.5 = 10 cum ,1 cum =0.35
0.35/(1+6)=0.05
for cement 0.05/0.0347 (for 50 kg cement bags ...1450kg/cum)
=1.440 or 1.5 no. of bags
for sand 0.05*6= 0.3 cum...
Ans.. 503 bricks, 1.5 no.bag of cement and 0.3 cum sand
 
Is This Answer Correct ?    8 Yes 15 No
Vivek Rai
 
  Re: 1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3"
Answer
# 8
brick size in meter=.23*.115*.075 =.0019
add 10 mm mortar for ech sides=(.24*.125*.085)=(.0025)

bricks required for 1 m3 =(1/(0.0025)=400 nos

mortar required =(.0025-.0019)*400=.24

add 15% for wastage = (.24*1.15)=.276m3

so required sand is =.276 m3

cement is =(1440/6)=240*.276= 66 kg
 
Is This Answer Correct ?    18 Yes 11 No
Raja J
 
  Re: 1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3"
Answer
# 9
494 bircks,1.029 bags of cement,52.935 Cft of sand 
Is This Answer Correct ?    4 Yes 6 No
Md Gyasuddin Ahsan Arfi
 
  Re: 1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3"
Answer
# 10
Sorry For above Answer

By Analysis of Rate-2007

#Bricks of class designation 7.5 in foundation and plinth
in :-
Brick with wastage = 494
Mortar = .25
Cement Ratio is 1:6, then
Cement=(.25/(1+6))*1 = .0357 cum
Cement in Bags = .0357/.034722 = 1.0286 bags

Sand = (.25/(1+6))*6 = 0.2143 cum
= 0.2143 * 35.29 = 7.56 Cft
# Bricks of class designation 7.5 in superstructure above
plinth level up to floor V level in all shapes and sizes
in:-
Brick with wastage = 494
Mortar = .22
Cement Ratio is 1:6, then
Cement=(.22/(1+6))*1 = .03143 cum
Cement in Bags = .03143/.034722 = 0.905 bags

Sand = (.22/(1+6))*6 = 0.189cum
= 0.189* 35.29 = 6.655 Cft
 
Is This Answer Correct ?    8 Yes 7 No
Md Gyasuddin Ahsan
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
wat is diff. between rectangle & parallelogram?   4
which lime used in white washing   1
what is the weight of sand,corrse aggregate and steel,for 1cum Jade-Software 1
Rectangular room is more effective than a square room because   1
What is meant by Rolling Margin? & which material will effect in this ?   2
Why do not use fly ash bricks for waterproofing. ABB 3
WHY DO YOU WANT TO WORK HERE?   8
what is the difference between compaction and consolidation??   4
8. What do you find more useful in your present work your education or your practical experience from previous jobs or traineeships?   4
Which Cement is good for concrete, Is that grade 33, 43 or 53? Modi-Builders 9
What is the Laplenth for Reinforcement for Verticl and horizontal Structures as per IS code?   7
Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?   6
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com