Introduction,scope,test team and their
responsibilities,test environment,S/W&H/W reqiurements,test
data preparation,levels of
testing,seviroty&priority,shedule,risk,automation
plan,features to test,bug life cycle all these are
documents of test plan.
Definition :Test plan is road map for entire testing
activity.
It includes
Test objective ie goal of Testing
Test Strategy: What type of testing required
Risk analysis
Communication
Test Environment
Test Tools
Test Plan:
Test plan is the freezed document developed from SRS, FS,
UC. After completion of testing team formation and risk
analysis, Test Lead is preparing test plan document in term
of what to test, how to test, who to test, and when to test.
There is one Master Test Plan consists of reviewed Project
Test Plan and Phase Test Plan. So there is general talk
about Project Test Plan.
Components are as follows:
1. Test Plan id
2. Introduction
3. Test items
4. Features to be tested
5. Features not to be tested
6. Approach
7. Testing tasks
8. Suspension criteria
9. Features pass or fail criteria
10. Test environment (Entry criteria, Exit criteria)
11. Test deliverables
12. Staff and training needs
13. Responsibilities
14. Schedule
15. Risk and mitigation
16. Approach
Can anyone listout major scenarios for a payment submission
web page???
Can anyone tell me that yahoo messenger is a web-based
application or a windows based application???
when we swipe the credit card what will genertaed in Back
end.
how system will validated from the back end
for credit card who is Aquriree and Issuer ,