ALLInterview.com :: Home Page KalAajKal.com
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
tip       Ask Questions on ANYTHING, that arise in your Daily Life at     FORUM9.COM
Google
 
Categories  >>  Software  >>  Testing  >>  QA Concepts
 
 


 

 
 Automation Testing interview questions  Automation Testing Interview Questions
 Manual Testing interview questions  Manual Testing Interview Questions
 QA Concepts interview questions  QA Concepts Interview Questions
 Mobile Testing interview questions  Mobile Testing Interview Questions
 Test Cases interview questions  Test Cases Interview Questions
 Test Documents Reporting interview questions  Test Documents Reporting Interview Questions
 Testing AllOther interview questions  Testing AllOther Interview Questions
Question
What is QA Life cycle
 Question Submitted By :: Guest
I also faced this Question!!     Rank Answer Posted By  
 
  Re: What is QA Life cycle
Answer
# 1
QA Life Cycle is nothing but the SDLC models and the 
requriments of the client,Design,Testing and production of 
the product with respective to cost is the Life cycle of QA.
 
Is This Answer Correct ?    5 Yes 3 No
Sreedhar
 
  Re: What is QA Life cycle
Answer
# 2
QA Life cycle is 

Risk Analysis
Test plan
Test design
Test excution
Defect tracking
Reporting
 
Is This Answer Correct ?    10 Yes 2 No
Guest
 
 
 
  Re: What is QA Life cycle
Answer
# 3
QA Life cycle starts from the project Intiaton to the 
Project deployment.There are different stages such as:
1)Assesing the development plan.
2)Preparing the Test plan.
3)Reqirement phase testing .
4)Designe phase testing .
5)Program phase testing .
6)Analyzing the test results.
7)Black box or functional testing.
8)Analyzing the functional test results.
9)Instalation testing
10)Testing the Test effectiveness of the process.
 
Is This Answer Correct ?    5 Yes 1 No
Satheesh
 
  Re: What is QA Life cycle
Answer
# 4
The QA life cycle starts from project initiation to project 
windup if its a development project otherwise QA life cycle 
for maintenance will have to take care of every change 
requests.For the new change same procedure like 
estimation,resourcea,efforts etc are to be taken care of.
the phases of life cycle of Software as per  qa activities 
are:

1. project Initiation -It includes following:
-Statement of work(SOW)or contract
-Kick-off Minutes of meeting
-Project initiation note
-Resorce tracking sheet
-Estimation
2. Project Planning
-Project Management Plan
-MPP (project plan )
-Risk logs and Issue logs
3. Project Monitoring and control
-Check for Requirement Traceability matrix preperation and 
updations
-Reviews of the following-
Requirement documents (SRS)
Design documents 
Testplan,test cases 
Code
-Baselining of the documnents
-Collection of all Documents in a repository
-Time lines constraint and schedule tracking
-Deliveries and Releases time constraints
4. Configuration Management
-Tracking tool for CM
-Tracking and managing the change requests
-Impact analysis
-logs of change requests
5  Risk Management
-Tracking of Risk logs and issue logs
-Root cause analysis
-alternative solutions
-Mitigation and Contingency plans
6.Project windup
-Prepare windup plan 
-Lesson learnt in central repository
-windup report
 
Is This Answer Correct ?    5 Yes 1 No
Sa
 

 
 
 
Other QA Concepts Interview Questions
 
  Question Asked @ Answers
 
can anybody explain me the role of QA in every phase of SDLC (PHASE WISE) to privent from bug.with real life example.1)requirement analy.2)designing 3)coding 4)testing 5)implementation 6)maintenance. PHASE WISE Aloha-Technology1
what is cyclomatic complexity ?  2
What documents QA team needs from Development to orginize a QA process  2
What is difference between Six Sigma and CMMI and how both relate/differ to each other  1
Adhoc testing is advisable for every project? Logica-CMG2
When to start and Stop Testing? Ordain-Solutions7
If a bug is found at the time of release.what you do? Thinksoft5
What is test execution/efficiency metrics? Covansys2
what is output of testplan?  1
what is entry and exit criteria?  1
What are the Blackbox Testing Techniques?  1
After which phase is the inspection process optional? Choice 1 Preparation Choice 2 Rework Choice 3 Planning Choice 4 Inspection meeting Choice 5 Overview Brainbench-Certification2
What is Buddy testing?  1
What is the difference between QA and QC?  4
why we do testing ? what r the uses? Thatavarti-Technologies5
In an Interview I have been asked the following questions, 1) How would allocate job to your team members if you are assigned a role of Team Lead. 2) The second question was, do you follow any technique for the distribution of time while assigning jobs to your team members. For, both the questions I was clueless to answer. Please give me a practical approach for the above questions.  3
What is Impact analysis.how to do impact analysis in yr project.. MBT10
how can you describe the defect sevirority n priority...mean low, medium and high... on what factors can we fix that defect is major r low r medium sevirori and proirity ??? TCS4
What is the format of bug report? Accenture6
how can u test cookies? IBM1
 
For more QA Concepts Interview Questions Click Here 
 
 
 
 
 
   
Copyright Policy  |  Terms of Service  |  Help  |  Site Map 1  |  Articles  |  Site Map  |   Site Map  |  Contact Us interview questions urls   External Links 
   
Copyright © 2007  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  Forum9.com   ::  KalAajKal.com