| Other PP Interview Questions |
| |
| Question |
Asked @ |
Answers |
| |
| Describe the change process for material BOMs |
| 1 |
| while extending the material master view after saving error
is coming that the field material number is defined as a
required field,it doesnt contain an entry. After selecting
that it is showing the particular material may be locked.
Pls do the needful. |
| 3 |
| Do your single-level BOMs represent production levels and do
you keep your BOM header materials in stock? If not, do you
produce non-stock items, or are some assemblies just used as
structural elements in a BOM? |
| 1 |
| Product Costing Run is over. Now If I add one more
rawmaterial for that material also it has to included & run
the cost. But it is not happening? |
| 5 |
| specify three views for which formulas can be entered.(work
center) |
| 1 |
| Integration of PP with MM , Integration of PP with SD . |
TCS | 1 |
| What are different MRP types? |
Volkswagen | 15 |
| What is the significance of order types in PP? |
| 5 |
| What do you mean by Production Support,with some examples? |
IBM | 4 |
| what is standard info set? where it is used in pp? |
IBM | 2 |
| what is pp cycle? |
IBM | 5 |
| What is COIS? |
IBM | 7 |
| |
| For more PP Interview Questions Click Here |