when reinforcement binding completed if there is more cover
than the required what is the solution to reduce the cover?
No Answer is Posted For this Question
Be the First to Post Answer
cross hairs in surveying telescope are fitted in the objective lense at the center of the telescope at the optical centre of eyepiece in front of the eyepiece
How do i calculate material requirements for various concrete ratios, brick masonry for 1 cum?
How to calculate the quantity of materials for M20 grade concrete
When was the first motorway built in england?
how to identify the failure of building by expansive soils
how to caluclate sienerge qty in construction in ap
0 Answers Rites, VR Residency,
What is meant by a context menu in a cad software?
What is Niminal mix and Design Mix ? write difference between them ?
bar bending schedule?
what is the difference between NP2 Class and NP3 Class RCC Hume pipes
which is code is used for design of steel structure
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa