ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3156)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3310)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13485)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2396)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (424)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (166)
 Instrumentation interview questions  Instrumentation Interview Questions (2409)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (109)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (45)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (81)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1207)
Question
how many cubic ft. for 50 kg ( 1 bag ) cement?
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
1M3 = 28.8Bags
so 1Bag= 1/28.8=.0347M3
then .0347*35.28=1.225CFT
 
Is This Answer Correct ?    86 Yes 11 No
Sumit
 
Answer
# 2
WE know 1cum= 35.32 cft
and 1 bag cement = 0.033cum
thus 1 bag cement= .033*35.32 cft
= 1.16556
 
Is This Answer Correct ?    57 Yes 25 No
1231421
 
 
 
Answer
# 3
1.25 cft 
Is This Answer Correct ?    44 Yes 14 No
Javed
 
Answer
# 4
1bag of cement is 1.25 cu.feet 
Is This Answer Correct ?    34 Yes 14 No
Sekar.k
 
Answer
# 5
1 Bag of cement is equal to 1.25 cft 
Is This Answer Correct ?    26 Yes 11 No
Muhammad Kashif
 
Answer
# 6
1.25
 
Is This Answer Correct ?    19 Yes 6 No
Guest
 
Answer
# 7
one bag cementis =1.25qft 
Is This Answer Correct ?    22 Yes 11 No
Jitender Mishra
 
Answer
# 8
unit weight of concrete = 1440kg/cubic meter
therefore unit weight is equal to weight over volume
given the unit weight already;
1440kg/cu.m = W/V
given also the weight of cement which is 50kg
so. cross multiply and we get
v= W/unit weight = 50/1440
and the answer is = 0.0347222 cu.m.
 
Is This Answer Correct ?    17 Yes 10 No
Gabriel
 
Answer
# 9
1Cum = 35.32 Cft
1bag of cement = 0.0347 Cum
= 0.0347*35.32 Cft
50 Kg of Cement = 1.225 Cft
 
Is This Answer Correct ?    6 Yes 0 No
Kalyan
 
Answer
# 10
1.2244781 cubic ft. 
Is This Answer Correct ?    3 Yes 0 No
Munesh Natrrajan
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
how to convert m 25 concrete to m 40?   2
If i buy some material and the seller asks me my TIN number what does that mean?? Is it my Taxpayers Identification number or it is my Tax invoice number? What does both of these stands for??? Simplex 1
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?   2
how the lap length is calculated in reinforcement of 110mm dia steel of Length 15.00 mtrs. & grade of concrete is M20 L 15
In IS:456-2000 the workability of concrete is given in mm (slump)in cl.7.1. In IS:10262-1982, cl.3.3.4 & table-6 says +/- 3 percent adjustment is required in the quantity of water (calculated as per table-4 or 5), for each increase or decrease in the value of compacting factor (i.e. workability of concrete) by 0.1. How it is possible to calculate the exact quantity of water required for a particular grade of concrete? What is the relation between Slump & Compacting factor of concrete? Unitech 1
how much quantity of work we can get by rod benders per day IVRCL 3
how much binding wire is required for one tone steel Jindal 14
how new RCC roof joined with existing RCc roof   4
The company is following same question pattern and giving same questions in all year for all batches from the starting of company they didnt even able to frame new question,,so guys if u want to place in cccl just mail me i will send the questions....ramyakvb@gmail.com....if u mug all those answers u will be selected no proper selction procedure is considered so it is better to place in some other company...All The best dont attend cccl   1
how much steel used in 100 sq feet   3
how to calculate 1 cubic meter rcc concrete 1:1.5:3 ratio ,how much aggrates and sand , quanitites   3
What is meant by Friction Pile?   3
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com