Bug is a condition which causes the s/w to fail.
eg:- programming errors, logical errors.
Defect is nonconfirmation with requirements i.e. it is the
difference between expected output and acutal output.
eg:- if we perform an operation on the AUT we expect the
output as "X" but the the operation results as "Y".
Here the expected value mismathes with actual value, so
this nonconfirmation with requirement is calle defect.
Bug comes in coding whle debugging developers find the bug
but while doing testing if any diff between actual result
and expected result it is called defect
Bugs & Defects meanings are changed with its location.
Example.. If Developer is compiling a Exe at that time any
defects converted into Bug, But a tester find that bug
converted into defects..
defect:-(eg)-consider ur launching a magazine.if the reader
finds the mistakes in that, its called as Defect.
another eg:ther is mistake in ur question (i.e diffect),
as its spelling is 'defect'....
THIS IS CALLED AS DEFECT
Error,bug,defect are given same menaing but it will be
used in different locations.When error will be get at the
client location it is defect,if it arrises at tester place
it is bug,if it will arises at developer place it is
error,but all of the given same meaning that is expected
behaviour of the application does not match with actual
behaviour of the application.
u have any qurriers contact with me.
mail id :physics143@gmail.com
As per my view Bug and Defect are same thing.
if u find the issue in production u may call it as defect.
if devloper find in dev env then they call it as bug
BUG:WHEN TESTER FIND DIFFERENCE BETWEEN EXPECTED OUTPUT AND
ACTUAL OUTPUT.
DEFECT:WHEN END USER REPORTS THE SAME THAT IS SAID TO BE
DEFECT.
IN OTHER WORDS, BUG CAN BE RECTIFIED AT DEVELOPER SIDE
BEFORE REALSING THE PRODUCT. DEFECT MAKE CUSTOMER
DISSATISFIED.
IF THERE IS DEFECT IN A PROJECT IT SHOWS THE POOR QUALITY
OF TESTING.
Hi,
Defect-difference between actual result and excepted result
know as a defect.
Bug-does not meet the actual application exception result
know as Bug.its ot we can say not fallow the correct process.
Hi, Cybage had a walkin on 12 Sep 09 in Pune. I had cleared
the technical round. Does anyone know the hr id to submit
the documents?
And also did anyone got a call for HR round? Please reply.
It’s urgent.
suppose if you press a link in yahooshopping site in leads
to some other company website?how to test if any problem
in linking from one site to another site?