Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3129)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3300)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13439)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2385)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (420)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (165)
 Instrumentation interview questions  Instrumentation Interview Questions (2401)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (107)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (45)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (80)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1203)
Question
how many labour is required for 1cum of concrete?
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
0.36 skilled and 2 unskilled labour is enough form onc cum
concrete
 
Is This Answer Correct ?    2 Yes 0 No
Enayatullah Mahroowal
 
Answer
# 2
3CUM/DAY/ MASON WITH 1 HELPER CAN DO RCC & 5CUM/DAY/MASON WITH 1 HELPER CAN DO PCC..IS NORMAL PRODUCTIVE NORMS OFA A MASON NOW-A-DAYS 
Is This Answer Correct ?    1 Yes 0 No
Sathesh.b.nama
 
 
 
Answer
# 3
Depend by work
area..
 
Is This Answer Correct ?    0 Yes 0 No
Babu
 
Answer
# 4
a gang of 18 labour is required at a mixer machine for rcc work. 
Is This Answer Correct ?    0 Yes 0 No
Mkg
 
Answer
# 5
Around 2 Mason and 1.5 helper per 1 cum concrete 
Is This Answer Correct ?    0 Yes 9 No
Chandu
 
Answer
# 6
1 Mason with 1 helper can do 30MT3 per day 
Is This Answer Correct ?    6 Yes 16 No
Ahmed
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
why we always consider Bulkage due to the voids only for the Fine aggregates not for the Coarse aggregates   3
what are the construction sequences in DAM, Hygh Way / Road, Thermal Power Plant, Hydro Power Plant, Tunnel ? RRB 2
Difference between design mix and nominal mix UltraTech 1
significance of specific surface area of particles?   2
23. If you had enough money to retire right now, would you?   3
How to calculate super built up area in residential building   1
What the codes used for Rigid Pavement and Flexible pavement. bscpl 1
Which construction joint is much better ? either vertical or horizontal? Pratibha-Industries 2
HOW TO CALCULATE THE CEMENT & SAND REQUIRED FOR 1SQM BLOCKWORK OF 200MM THICK?   1
convert 1 guntha = how many wars or 1 war = how many gunthas Shaw 3
what is C50 expressed in kg/m3   1
what is scour depth $ what's the process to determine it?   1
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   