Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3076)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3289)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13331)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2363)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (416)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (79)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (163)
 Instrumentation interview questions  Instrumentation Interview Questions (2381)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (106)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (43)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (77)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1196)
Question
how many labour is required for 1cum of concrete?
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
0.36 skilled and 2 unskilled labour is enough form onc cum
concrete
 
Is This Answer Correct ?    2 Yes 0 No
Enayatullah Mahroowal
 
Answer
# 2
3CUM/DAY/ MASON WITH 1 HELPER CAN DO RCC & 5CUM/DAY/MASON WITH 1 HELPER CAN DO PCC..IS NORMAL PRODUCTIVE NORMS OFA A MASON NOW-A-DAYS 
Is This Answer Correct ?    1 Yes 0 No
Sathesh.b.nama
 
 
 
Answer
# 3
Depend by work
area..
 
Is This Answer Correct ?    0 Yes 0 No
Babu
 
Answer
# 4
Around 2 Mason and 1.5 helper per 1 cum concrete 
Is This Answer Correct ?    0 Yes 9 No
Chandu
 
Answer
# 5
1 Mason with 1 helper can do 30MT3 per day 
Is This Answer Correct ?    5 Yes 16 No
Ahmed
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
what will do when 7days concrete has failed and structure has constructed?   5
Key is put at the time of casting 1st lift of column to get– –   1
Why did you choose to be an civil engineering   8
MEANING OF M20 AND M200 CONCRETE   7
which purpose we are provide groove at sides of door & window frames, columns & beams   1
plz tell me max persantage of sand for every mix design by volume or weight.   2
what are the types of footing Lanco 1
what is the density of Coarse Aggregate in 1 cu m of Concrete?   7
How to evaluate the elastic modulus of soil from the plate load test result? for example ..one of test results are here Max. settement =4.56mm(at 900kPa) Residual settlement = 4.02mm Maximum pressure on soil 900kpa Soil bearing capacity 300kpa Plate diameter=300mm Thickness =25mm Soil description =Grey, clayey silty SAND with gravels and rock fragments   1
Why shoring is employed in building industry?   1
What is the Content in RCC M 35 Grade e.g water content,sand,metal ,cement etc.   4
why the brick is red in colour?   4
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright © 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com