ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3152)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3305)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13478)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2395)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (424)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (166)
 Instrumentation interview questions  Instrumentation Interview Questions (2408)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (109)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (45)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (81)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1205)
Question
How calculate the material in concrete mix in ratio 1:2:4 ?
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
to calculate ratio 1:2:4
we consider 1 cu.m. ratio 1:2:4
total quantity=1+2+4=7
for cement=1*15.2/7=2.17cu.m.
for bag=2.17/0.35=6.20 bag
for sand=2.17*2=4.34cu.m.
for aggregate=2.17*4=8.68cu.m.
 
Is This Answer Correct ?    17 Yes 9 No
Shaikh Moyunuddin
 
Answer
# 2
1cement 2 sand 4 mittel 
Is This Answer Correct ?    1 Yes 9 No
Guest
 
 
 
Answer
# 3
1st we add in 10 liter water and then aggregate and send is down so the mixture of water and cement we seprat and the aggregate separate by net from send
so all items are separate from mix concrete now you cheek quantity matched by 1:2:4
 
Is This Answer Correct ?    3 Yes 16 No
Umair K.k
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
what is the method of all soil testing in lab?   2
How foundation is designed, Column design and beam design L&T 3
I'm puting roof slab M20 Design Concrete,Twoway slab how many days wait for remooving of shuttering?   16
HOW MUCH WATER DO YOU NEED TO MIX IN TO COMPACT100M3 OF ROAD QUALITY BORROWPIT GRAVEL   1
what is the ratio of steel and concrete to use in slabs , beams, columns ? L&T 4
what is superelevation?   3
how to calculate the quantaty of steel in footing please show me detail procedure with the help of drawing   1
purpose of binding wire in RCC. Structually is there any requirements that how to tie the binding wire like cross or single or how many pices combine together to bind the steel. i need structually importance of binding wire.   1
how many labour is required for 1cum of concrete?   6
At which temperature in deg Celsius Asphalt is used for the pavement of Roads?   2
what is meant by point of contraflexure?   3
What is the procedure of Waterproofing in toilet sunken area ? ACIL 2
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com