ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3072)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3287)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13323)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2364)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (416)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (79)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (163)
 Instrumentation interview questions  Instrumentation Interview Questions (2375)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (106)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (43)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (75)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1195)
Question
Trapezoidal section footing calculation of Volume & its Area
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
V=(L X B X d) + h/6(A1 + A2 + 4Am)

L=Length of footing
B=Breadth of footing
d=Depth of bottom portion
h=Height of trapizodial portion (D-d)
A1= Area of bottom portion (L X B)
A2= Area of top portion (l X b )
Am= Mean area of A1 AND A2
 
Is This Answer Correct ?    8 Yes 0 No
Sandeep
 
Answer
# 2
V=(L X B X d) + h/3(A1 + A2 + SQRT(A1 X A2 )

L=Length of footing
B=Breadth of footing
d=Depth of bottom portion
h=Height of trapizodial portion (D-d)
A1= Area of bottom portion (L X B)
A2= Area of top portion (l X b )
 
Is This Answer Correct ?    9 Yes 2 No
Chandramouli Bv
 
 
 
Answer
# 3
(LxBxD)+((h/3)x((A1+A2)+(sqrt of (A1xA2)))) 
Is This Answer Correct ?    7 Yes 1 No
Sathish
 
Answer
# 4
H/3 (A1 + A2 + sqrt A1A2) 
Is This Answer Correct ?    7 Yes 1 No
Anand Nair
 
Answer
# 5
V=(L X B X d) + h/3(A1 + A2 + SQRT(A1 X A2 ) 
Is This Answer Correct ?    3 Yes 0 No
Ilayaraja
 
Answer
# 6
(A1 +B1)/2 
Is This Answer Correct ?    2 Yes 2 No
Waqas
 
Answer
# 7
(L*b)+(h/3(a1+a2)+sqroot(a1*a2) 
Is This Answer Correct ?    2 Yes 7 No
K.sankar
 
Answer
# 8
((L+B)D+h/3)(A1+A2+root of(A1+A2)) 
Is This Answer Correct ?    5 Yes 12 No
Sweety
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
whats the field test of cement,aggregate and water   6
how many average of shuttering in one cubic meter concrete   4
HOW CAN I CALCULATE BENTUP BAR'S INCLIND DISTANCE ?   2
what is singly & doubly rc beam? what is difference between them?   5
how many cement use for 1cum concrete for 25Grade.   13
give an example for cantilever structure   9
how to calculate the density of cement and how can we convert no. of Kgs of cement to Metric tonnes??   2
Respected Sir, I am from a hilly place called Darjeeling ,I have constructed house of 9 column out of which 4 of the column is under water , i have put rcc slab on top and on top of the rcc slab i have construced two room house with bricks and light roof , now i am planning to change the light roof with rcc slab for the two room, my main concern is will the column under water will hold the load of the new rcc slab coz it already 10 to 12 yrs old , i dont know what to do , can u advice me regarding this matter, weather to leave the upper floor roof light or make it rcc slab.(If i put the slab , it will require 45bags of cement and u calculate how much of steel and sand and pebbles) thanks with regard Anand   1
which I.S. code shown wastage in structural steel   1
percentage of wastage limits in construction materials EX : min & max . cement = fine aggregate = coarse aggregate = admixture = wood = tiles = painting = marbles = bricks = NCC 1
200sq.ft of slab and thickness is 6" in that how much cement are required(bags), sand & aggregates are in cu.m, choose grade of concrete is m20. L&T 3
who to calculate the bar bending schedule? APPSC 1
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com