ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3120)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3300)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13434)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2385)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (420)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (165)
 Instrumentation interview questions  Instrumentation Interview Questions (2398)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (107)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (45)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (79)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1203)
Question
Trapezoidal section footing calculation of Volume & its Area
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
V=(L X B X d) + h/6(A1 + A2 + 4Am)

L=Length of footing
B=Breadth of footing
d=Depth of bottom portion
h=Height of trapizodial portion (D-d)
A1= Area of bottom portion (L X B)
A2= Area of top portion (l X b )
Am= Mean area of A1 AND A2
 
Is This Answer Correct ?    8 Yes 0 No
Sandeep
 
Answer
# 2
V=(L X B X d) + h/3(A1 + A2 + SQRT(A1 X A2 )

L=Length of footing
B=Breadth of footing
d=Depth of bottom portion
h=Height of trapizodial portion (D-d)
A1= Area of bottom portion (L X B)
A2= Area of top portion (l X b )
 
Is This Answer Correct ?    9 Yes 2 No
Chandramouli Bv
 
 
 
Answer
# 3
(LxBxD)+((h/3)x((A1+A2)+(sqrt of (A1xA2)))) 
Is This Answer Correct ?    7 Yes 1 No
Sathish
 
Answer
# 4
H/3 (A1 + A2 + sqrt A1A2) 
Is This Answer Correct ?    7 Yes 1 No
Anand Nair
 
Answer
# 5
V=(L X B X d) + h/3(A1 + A2 + SQRT(A1 X A2 ) 
Is This Answer Correct ?    3 Yes 0 No
Ilayaraja
 
Answer
# 6
(A1 +B1)/2 
Is This Answer Correct ?    2 Yes 2 No
Waqas
 
Answer
# 7
(L*b)+(h/3(a1+a2)+sqroot(a1*a2) 
Is This Answer Correct ?    2 Yes 7 No
K.sankar
 
Answer
# 8
((L+B)D+h/3)(A1+A2+root of(A1+A2)) 
Is This Answer Correct ?    5 Yes 12 No
Sweety
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
What is the maximum distance between the stirrups?   11
how many materirials in 1 m3 concrete   5
While painting,if the gypsum is the first coat to seal holes on wall,It said to have tendency get away with all other coat. What is the solution on that?   1
how much anti termite treatment( ATT) liter used in one sq mtr floar area? & what is ratio of ATT & water.   2
What is logic behind the use of Steel bar insted of gold bar? Rites 9
How to preparation billing for high rise building? anyhow can give the tips L&T 2
How to calculate compressive strength of concrete?   10
quick sand is a type of sand flow condition occuring in cohesive soil flow condition occuring in cohessionless soil all above   1
what is bulkage   1
civil engineering means abut Maytas 11
how would you describe yourself and your ideal job   2
sometimes, in a column, reinforcement is provided equally on 2 sides and sometimes on 4 sides.what will be the difference in the method of designing?   3
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com