ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3079)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3290)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13336)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2363)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (416)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (80)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (163)
 Instrumentation interview questions  Instrumentation Interview Questions (2382)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (106)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (44)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (78)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1196)
Question
What is the maximum allowable 'Silt content' in River sand
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
10 % as per IS 2386 
Is This Answer Correct ?    24 Yes 10 No
Abhishek
 
Answer
# 2
3% by weight for uncrushed fine aggregate and 15% by weight
for crushed aggregate as per IS: 383(page no:8)
 
Is This Answer Correct ?    12 Yes 7 No
B.srinivasa Rao
 
 
 
Answer
# 3
maximum of 8
percent allowable
 
Is This Answer Correct ?    23 Yes 20 No
Prabu
 
Answer
# 4
3% BY WEIGHT AND 10% BY VOLUME AS PER IS 2386 
Is This Answer Correct ?    5 Yes 3 No
Kuldeep Mahto
 
Answer
# 5
Max. of 3% by weight in river sand(b'cause it is uncrushed)
as per IS:383
 
Is This Answer Correct ?    9 Yes 8 No
B.srinivasa Rao
 
Answer
# 6
maximum allowable silt content in river sand is 7% 
Is This Answer Correct ?    4 Yes 3 No
Zumbar Kale
 
Answer
# 7
Maximum allowable silt content in river sand is 4% 
Is This Answer Correct ?    8 Yes 8 No
Mohammed Aijaz Hussain
 
Answer
# 8
10% 
Is This Answer Correct ?    0 Yes 0 No
Mkgikli,
 
Answer
# 9
4% by volume and 7%by weight 
Is This Answer Correct ?    0 Yes 0 No
Zd Thuama
 
Answer
# 10
Not more than 6% as per IS Material Testing Norms 
Is This Answer Correct ?    0 Yes 0 No
Bharath M,9980644165
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
What are the advantages of Prestressed Concrete   4
IN LOW RISE BUILDING PER SQ FT HOW MANY MATERIAL REQ. SAND &CONCREATE&CEMEBT ZCL 1
How many types of rcc slab   4
How to calculate the sand and aggregate in concrete OMC 1
wat is the optimum mix design for M25 grade of concrete ? is the ratio 1:1.5:3.65 correct? ACC 6
WHAT IS DIFFERANCE BETWEN TOR STEEL AND TMT STEEL L&T 3
what are the types of bridges respective to the span ?   1
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause? L&T 1
How the reconcilation of the steel can be done?   3
what is a pretension and post tension with an example   1
1sqm tile laying how much cement required?   1
As per thumb rule cement required per 1 cum of M20 concrete is 411Kg/cum(1.57/5.5=0.285cum of cement i.e 0.285*1440=411Kg).But as per PWD rate analysis cement required is 347Kg/cum.the difference is 64Kg.This kind of difference is coming every grade of concrete.Can you give perfect suggestion regarding this.   2
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com