| what is quick sand |
| 4 |
| The horizontal distance between parallel main reinforcements
in RC slab shall not be more than |
BEL | 1 |
| WHAT IS THE CALCULATION FOR FINDING CEMENT AND SAND FOR 10' * 12' AREA RATIO 1:6 THICKNESS 12 MM
|
JVS | 1 |
| How to calculated +ve & -ve Bending moment coefficient in
water tank design for design of side walls. |
| 3 |
| what is the difference between stress and pressure?? |
RITES | 3 |
| i want to know the easy way to find the quantity of steel
in a slab , coloumn |
ME | 1 |
| What is a BBS?Find out the cutting length for a 300*300 column with 40 mm cover? |
L&T | 11 |
| What is labour rate per kg for cutting,fixing and binding
of reinforcement steet..?? |
| 2 |
| how much quantity are required like cement,sand,aggregate
for (46*29*0.41)feet slab? how much this quantity can be
calculated? |
| 3 |
| What is the role of a PMC(project management consultancy)
in any construction work? |
| 2 |
| How to calculate the compressive strength of 28 days of
concrete where we have 7 days compressive strength? |
ACF | 2 |
| 1 building project (work in progress) and following are sum
detail about his project
1) Using local rebar grade 415
2) Total built up area- 60000 sq.ft
3) Floors to be constructed – 21 storey
4) Estimated requirement of Steel per sq. foot –
7KG/sq.ft
5) Concrete grade – M35
6) Rebars mainly required (sizes)- 16,20,25,32 & (8 mm
for stirrups)
Wanted to ask u if this person uses 500D…what are the
benefits he will be getting? Whether his per Sq. foot
consumption can b reduce? If yes den around how much?
|