ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3077)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3289)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13333)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2363)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (416)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (79)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (163)
 Instrumentation interview questions  Instrumentation Interview Questions (2381)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (106)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (44)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (77)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1196)
Question
How many kilograms of sand required in cufic feet for one 
cubic meter of M25 grade concrete
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
10.1706048 sq feet need in one meter qube 
Is This Answer Correct ?    3 Yes 0 No
Himanshu
 
Answer
# 2
sand for 1 cumt concrete 0.48cu mt
s.g of sand 2200kg/cu
sand .48x2200 -
 
Is This Answer Correct ?    0 Yes 0 No
Devineni Srinivasa Rao
 
 
 
Answer
# 3
937.5kg sand per m3of m25 
Is This Answer Correct ?    0 Yes 2 No
Vijay Patel
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
What is the OMC and MDD for subgrade (soil),Granular Sub Base, wet Mix Macadam in your project? L&T 1
what is shear key and steel schedule?   2
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?   1
explain yourself? TCE 1
what is bulkage   1
How can we calculate quantity of slab, beam @ column ? Beam should be calculated by deducting slab thickness or slab should be calculate in to in ? SMC 4
what are the advantages and disadvantages of using bentonite slurry in bored cast in situ piles, both in terms of design and execution point of view. Punj-Lloyd-Ltd 2
What is the difference in design between Working Stress method & Limit State Method ? Briefly Explain.   1
How we can calaculate materials required for block work(1m3) block size 33cm x 20 cm x 17 cm, mortar 1:6   3
Can any one give me any link to download civil engineering code in free ?   3
weight of 32mm rod/m   5
For 25mm thick plastering how much sand and cement is used for 1 sft Design-Consortium 1
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com