Smoke testing in nothing but testing the application whether
all the major functionalities are available in order to do
thorough testing.
nothing but checking whether build is stable or not..
A quick-and-dirty test that the major functions of a piece
of software work. Originated in the hardware testing
practice of turning on a new piece of hardware for the
first time and considering it a success if it does not
catch on fire.
The exercise to carry out to check the Application Build is
working fine and stable for the Extensive Testing @ the
Tester's End. Basically the testing is done by the
Developers before the Build delivered to QA team.
1. Checking for the basic functinality or basic features of
the project once we receive the build is called Smoke
Testing.
2. If any of the basic functionality is failed, then we
dont continue with testing. we simply reject the build. It
means we will check whether the build is stable or not.
3. Here we will select some of the functionality test cases
and these test cases are called smoke test cases. All these
test cases should be passed.
Hi,
In Smoke testing we are mainly focus on the major
functionalities.. if the major functionalities are not
working ( that means build is not stable) then we are going
to stop the testing.
Regards,
Satya.k
Smoke Testing:
-------------
--> Testing done to ensure that the product is testable.
--> Smoke test is a collection of written tests that are
performed on a system prior to being accepted for further
testing.
--> This is also known as build verification test.
Smoke Testing is used for whether the Bulid is Stable or not
if it is not ready for testing we will immediatly stop the
testing and sent back to the Developement dept
how The engineer communicates wiht T.L as well as test
manager, In wich situation this type of i mean serious
commnication takes place(give me one real time example).and
how the interaction will takes place between tester and
client can anybody plz clatify me.
suppose the product/appication has to deliver to client at
5.00PM,At that time you or your team member caught a high
severity defect at 3PM.(Remember defect is high severity)
But the the client is cannot wait for long time.You should
deliver the product at 5.00Pm exactly.then what is the
procedure you follow?
I Want to know for the different fields For e.g there are 6
different fields and menus, How much possible test Cases
can be written there is any calculation?
Hello Friends someone can help in giving best institute
with address to do testing course please. I heard Mr.
Nageswara Rao is best. Can some one give his complete
contact details please.