ALLInterview.com :: Home Page            
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   ERRORS new
   Refer this Site  Refer This Site to Your Friends  Site Map  Bookmark this Site  Set it as your HomePage  Contact Us     Login  |  Sign Up                      
Google
   
 
Categories >> Engineering >> Civil Engineering
 
 


 

 
 Civil Engineering interview questions  Civil Engineering Interview Questions (3073)
 Mechanical Engineering interview questions  Mechanical Engineering Interview Questions (3287)
 Electrical Engineering interview questions  Electrical Engineering Interview Questions (13324)
 Electronics Communications interview questions  Electronics Communications Interview Questions (2363)
 Chemical Engineering interview questions  Chemical Engineering Interview Questions (416)
 Aeronautical Engineering interview questions  Aeronautical Engineering Interview Questions (77)
 Bio Engineering interview questions  Bio Engineering Interview Questions (17)
 Metallurgy interview questions  Metallurgy Interview Questions (79)
 Industrial Engineering interview questions  Industrial Engineering Interview Questions (163)
 Instrumentation interview questions  Instrumentation Interview Questions (2375)
 Automobile Engineering interview questions  Automobile Engineering Interview Questions (106)
 Mechatronics Engineering interview questions  Mechatronics Engineering Interview Questions (38)
 Marine Engineering interview questions  Marine Engineering Interview Questions (43)
 Power Plant Engineering interview questions  Power Plant Engineering Interview Questions (75)
 Engineering AllOther interview questions  Engineering AllOther Interview Questions (1196)
Question
How to calculate Cement, Sand and Kapachi required for M20, 
M25
 Question Submitted By :: Civil-Engineering
I also faced this Question!!     Answer Posted By  
 
Answer
# 1
volumetric proportions for M20-1:1.5:3 and M25 -1:1:2 
Is This Answer Correct ?    16 Yes 5 No
K.prakashchandra
 
Answer
# 2
for nominal mix like M10,M15,M20,M25 the proportion of cement ,sand & agg is fixed as posted above.but for rich mix like M30,M35... the proportion is requred to be design by various method like IS method by using chart,table etc. 
Is This Answer Correct ?    2 Yes 0 No
N3
 
 
 

 
 
 
Other Civil Engineering Interview Questions
 
  Question Asked @ Answers
 
What is HEAVIER? A kilo of SAND OR A kilo of GRAVEL?   13
what"s the formula find the cement consumption for brick work 23 thick wall 1 m3? L&T 6
I have used the proportion of cement:sand:gravel, is 1:2:4. cement and the sand was provided by the company but i provided the gravel. this combination was used to fill 500 cubic ft of wall. now i want to know how much gravel was used in making the wall. can you guys please help me?   2
what is the I.S. CODE of RCC CEPTAM 2
what type of qustions can i expect from soil mechanics HPCL 1
what is grid line? why are we provided small dia reinforcemen in slab against beam n column?   1
How many layers in 12mm and 18mm plywood? L&T 4
when will the position neutral axis shifted in beams   2
WHEN BRICK SIZE IS 3X5X9" , WHAT WOULD BE THE NUMBER OF BRICK REQUIREMENT FOR 100 SQFT AREA OF 5" width?   6
How bonding is done for composite massonary?   1
ratio of sand, cement and metal in all concrete mix   2
Q:What is the formula of bar to bent the slab in bent slab? Second question Q: what is formula to calculate the hook?   5
 
For more Civil Engineering Interview Questions Click Here 
 
 
 
 
 


   
Copyright Policy  |  Terms of Service  |  Articles  |  Site Map  |  RSS Site Map  |  Contact Us
   
Copyright 2013  ALLInterview.com.  All Rights Reserved.

ALLInterview.com   ::  KalAajKal.com