| Other CCDA Interview Questions |
| |
| Question | Asked @ | Answers |
| |
| In which category should Frame Relay be placed within the
following Job Aid?
Name of Protocol Type of Protocol # of Users # of Hosts or
Servers Comments | | 1 |
| What are two services that the OSPF Hello protocol provides?
A. It discovers neighbor routers
B. It gets routes from neighbors during startup
C. It helps elect a designated router
D. It allows administrator to test for connectivity between
two devices | | 1 |
| The following are examples of proactive network management
except:
A. Allocate sufficient staff time
B. Troubleshooting and solving system problems
C. Generate reports
D. Identify Problems | | 1 |
| What is not a function of the distribution layer?
A. Routing between VLANs
B. Implement tools such as access lists, packet filtering,
and queuing
C. Implement security and network policies
D. Provide workgroup/user access to the network | | 1 |
| What are the five areas of the ISO Network Management Model?
A. Performance management
B. Accounting management
C. Flow management
D. Configuration management
E. Operating management
F. Fault management
G. Routing management
H. Security management | | 1 |
| What happens to performance if the maximum MTU (Maximum
Transmission Unit) size is used?
A. Performance increases
B. Performance decreases
C. Performance stays the same
D. Performance has nothing to do with the MTU | | 1 |
| You may receive a case study including Token Ring and
Ethernet, so you may want to look at any constraints with
cabling between Token Ring and Ethernet networks.
Which statement describes the constraints imposed by the
existing network?
A. Replace all cabling
B. Test all cabling
C. Do not replace cabling
D. Use microwave instead of cabling | | 1 |
| What are two ways to connect a PC to a LAN when using ATM
(Asynchronous Transfer Mode)?
A. ATM endpoint
B. ATM LAPB
C. ATM router
D. ATM switch | | 1 |
| Which of the following are true regarding switched virtual
circuits (SVCs) and permanent virtual circuits (PVCs)?
Choose two.
A. SVCs and PVCs can use the same circuit.
B. PVCs are permanently established virtual circuits.
C. SVCs and PVCs terminate the circuit when data
transmission is complete.
D. SVCs are virtual circuits that are dynamically
established on demand and terminated when data transmission
is complete. | | 1 |
| Which address is updated at each hop in the path in path
switching? | | 1 |
| 5. Which Two Settings must be configured in order to use the
GUI to configure Call Admission Control with voice Applications
| Pari-Networks | 1 |
| What are metrics used with IGRP?
A. Ticks
B. Load
C. Hops
D. Delay | | 1 |
| The following are the four steps in establishing an X.25
virtual circuit. Place them in the correct order.
A. The PSE (Packet Switch Exchange) passes the packet to the
next remote DCE
B. The local DCE packet binder sends packet to the closest
PSE (Packet Switch Exchange)
C. The source DTE sends packet to the local DCE
D. The remote DCE examines the packet header of destination DTE | | 1 |
| Match the following routing techniques with the correct
descriptions:
A. Static Routing 1. Mandatory configuration
B. Dynamic Routing 2. No route updates
3. Can better tolerate failures
4. Sends update when topology changes
5. Path is determined by the router
7. Traffic is reduced | | 1 |
| Which router would you choose for your design?
A. 1600
B. 1700
C. 3600
D. 3640
E. 7200 | | 1 |
| What type of address is analyzed by a Layer 2 switch?
A. network address
B. MAC and network address
C. Protocol type, MAC, and network address
D. MAC address | | 2 |
| What is the first step in diagramming packet flow for the
terminals within a network?
A. Identify the end user nodes of all the terminals
B. Figure out the speed of all the servers
C. Find out where all the routers are located
D. Find out where all the switched are located | | 2 |
| EIGRP was developed to improve what two protocols?
A. OSPF
B. RIP
C. BGP
D. IGRP | | 1 |
| What device initiates a session in an X.25 network?
A. DTE
B. DCE
C. PSE
D. PAD | | 1 |
| Which of the following does not specify an application
requirement that affects your network design?
A. The number of users
B. The peak hours that the applications are used
C. The types of applications used
D. Security risks | | 1 |
| |
| For more CCDA Interview Questions Click Here |